final word on the POMs selection and long-term implementation. Table 1 contains<br />

the Athboy Catchment’s phosphorous loadings that were determined via modelling,<br />

summed across categories of pressures, and then compared against the loading<br />

consistent with the anticipated standard at average annual flow.<br />

Table 1:<br />

Estimated P loadings in the Athboy Catchment (Preliminary)<br />

P Loads (kg/year)<br />

Manure fertilised land 2,186<br />

Chemical fertilised land 2,255<br />

Septic systems 35<br />

WWTPs 811<br />

Total current 5,288<br />

Good status 2,299<br />

Target reduction 2,989<br />

Table 2 shows the literature-b<strong>as</strong>ed costs and effectiveness estimates of analysed<br />

me<strong>as</strong>ures.<br />

Table 2:<br />

Cost-effective me<strong>as</strong>ures for phosphorous for Athboy Catchment<br />

(preliminary)<br />

P Sources<br />

74<br />

Management<br />

me<strong>as</strong>ures<br />

Effectiveness<br />

(kg/year P red)<br />

Costs(5/year<br />

– 10 years)<br />

Cost-<br />

Effective<br />

(5/kg P red)<br />

Manure Manure management 437 250,000 572 6<br />

fertilised<br />

land<br />

plans<br />

25% stocking 546 22,800,000 41,758 15<br />

reduction<br />

Sheltered manure 218 150,000 688 7<br />

storage<br />

1.5 km 2 riparian 328 580,000 1,768 9<br />

buffers<br />

Feed optimisation 219 3,200 15 1<br />

plans<br />

500 m 3 retention 164 60,000 366 5<br />

ponds<br />

Chemical Fertiliser management 564 82,500 146 3<br />

fertilised<br />

land<br />

plans<br />

50% gr<strong>as</strong>sland 1,128 408,500 362 4<br />

conversion<br />

1.5 km 2 riparian 338 580,000 1,715 8<br />

buffers<br />

500 m 3 retention 451 60,000 133 2<br />

ponds<br />

Septic Inspections and 32 652,408 20,388 14<br />

systems upgrades<br />

Treatment plant tie-ins 35 244,678 6,991 12<br />

Education programme 9 75,000 8,333 13<br />

WWTPs MLE without filtration 561 2,649,000 4,722 10<br />

MLE with filtration 686 3,788,000 5,522 11<br />

CE<br />

Rank<br />

Figure 1 is the transformation of this information into the web-b<strong>as</strong>ed POM selection<br />

feature.