21.07.2014 Views

1975 Datsun 280z FSM - Spooled up Racing

1975 Datsun 280z FSM - Spooled up Racing

1975 Datsun 280z FSM - Spooled up Racing

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

done in reverse sequence of removal,<br />

with notice paid to the following<br />

points:<br />

1. When new condenser is used as<br />

replacement, be sure to add 28 g (1<br />

oz) of new oil thereto.<br />

2. Keep piping plug in place until<br />

immediately before piping work is<br />

started.<br />

3. As to tightening torque on piping<br />

connection, refer to "Piping".<br />

4. As to evacuating and charging<br />

system, refer to "General Service".<br />

5. Conduct leak t*est and make sure<br />

that there is no leak from connection.<br />

RECEIVER DRIER<br />

REMOVAL AND<br />

INSTALLATION<br />

1. Disconnect battery ground cable.<br />

2. Discharge system. Refer to Section<br />

"General Service for Discharging<br />

System".<br />

3. Disconnect pressure switch wires<br />

at connector.<br />

4. Disconnect refrigerant lines from<br />

receiver drier.<br />

Air Conditioning<br />

Note: Plug all pipe openings to prevent<br />

entrance of dirt and moisture.<br />

5. Remove receiver drier mounting<br />

screws and then remove receiver drier.<br />

6. When replacing receiver drier with<br />

a new one, charge system with 28 g (1<br />

oz) of compressor oil.<br />

7. Installation is to be done in reverse<br />

order of removal. With plugs<br />

taken off immediately before piping<br />

work is started, connect piping and<br />

receiver drier. As to tightening torque<br />

on piping, refer to "Piping".<br />

8. As to evacuating and charging<br />

system, refer to "General Service".<br />

9. Conduct leak test, and make sure<br />

that there is no leak from connection.<br />

PIPING<br />

Refrigerant system piping is as<br />

shown in Figure AC-35.<br />

In replacing flexible hose and tube,<br />

be attentive to following points:<br />

1. Before starting work, be sure to<br />

discharge system.<br />

2. In disconnecting tubes, be sure to<br />

use two wrenches on both tubes.<br />

3. Upon disconnecting tubes, plug<br />

all pipe openings immediately to prevent<br />

entrance of dirt and moisture.<br />

4. Compressed air must never be<br />

used to clean dirty piping. Clean with<br />

refrigerant gas.<br />

5. In connecting tubes, be sure to<br />

apply compressor oil to seating surface<br />

and then tighten tubes by prescribed<br />

tightening torque. See Figure AC-34.<br />

Be sure to use two wrenches when<br />

tightening a flare nut of tube.<br />

Coat seat surfaces with compressor<br />

oil and then tighten.<br />

AC263<br />

Fig. AC-34 Pipe connection<br />

6. Make sure of proper clamping.<br />

Start engine and raise engine speed to<br />

inspect if there is vibration or unusuai<br />

noise.<br />

7. Conduct leak test and make sure<br />

that there is no leak from connection.<br />

8. As to evacuating and charging<br />

system, refer to "General Service" for<br />

"Evacuating and Charging System".<br />

ar'tf<br />

1 Condenser<br />

2 Compressor<br />

3 Receiver dryer<br />

4 Strainer<br />

Tightening torque kg-m (ft-lb)<br />

® : 4.0 to 5.0 (29 to 36)<br />

(8): 2.5 to 3.5 (18 to 25)<br />

AC553<br />

AC-29<br />

Fig. AC-35 Refrigeration line

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!