01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 area, <strong>and</strong> you're very careful not to allow a lot of<br />

2 water to get into that area so that the water drains<br />

3 away from that excavation, <strong>and</strong> I'm sure that's going to<br />

4 be part of the conditions associated with building that<br />

5 garage.<br />

6 MR. BIERIG: Right. Have you seen conditions<br />

7 structures were built -- is there a rule of thumb as to<br />

8 how far above the water table construction should be?<br />

9 MR. MOSBY: I have not seen conditions like<br />

10 that.<br />

11 MR. BIERIG: Okay. Thank you.<br />

12 Commissioners?<br />

13 Commissioner Burrows.<br />

14 MS. BURROWS: Thank you. I think it's in our<br />

15 report, but I want to address the issue of contamination<br />

16 of the water by the lush gardens which sound absolutely<br />

17 beautiful. I think that's been addressed in your<br />

18 mitigation measures to use particular environmental<br />

19 products. Is that --<br />

20 MR. BIERIG: Are you talking about<br />

21 pesticides?<br />

22 MS. ALMY: Mr. Chair, Commissioners, yes,<br />

23 there are conditions that speak to the types <strong>and</strong><br />

24 qualities of application materials that are going to be<br />

25 going onto l<strong>and</strong>scape that address the issue of<br />

109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!