01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 (Whereupon a short recess was taken.)<br />

2 MR. BIERIG: I'm calling us back into order<br />

3 on the Miramar matter. Would you take your seats,<br />

4 please.<br />

5 Mr. Ghizzoni, would you mind sort of<br />

6 summarizing <strong>and</strong> restating -- try us again on the last --<br />

7 MS. BLACK: Mr. Chairman, before Mr. Ghizzoni<br />

8 does that, I just want to let people in this room know<br />

9 that, if you walk out of this building, you're going to<br />

10 have a hard time getting back in.<br />

11 MR. BIERIG: I thought that was the plan.<br />

12 MS. BLACK: So if you need to leave <strong>and</strong> you<br />

13 want to come back, just let somebody on my staff know,<br />

14 <strong>and</strong> we'll try to accommodate it.<br />

15 MR. BIERIG: Please.<br />

16 MR. GHIZZONI: Chairman <strong>and</strong> Commissioners,<br />

17 let me try to shorten this down a little bit since I've<br />

18 been through it 1 1/2 times already. But the starting<br />

19 point is, again, the County's authority to require a<br />

20 further subsequent environmental impact report or<br />

21 supplemental EIR is phrased negatively within the<br />

22 Public Resources code <strong>and</strong> the guidelines.<br />

23 And that is that you may require either a<br />

24 one-topic EIR or two-topic EIR or full EIR only if you<br />

25 determine an increased significant environmental effect.<br />

341

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!