01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 them in <strong>and</strong> have more l<strong>and</strong>scaping there or have<br />

2 l<strong>and</strong>scaping in there if there is none on the l<strong>and</strong>scaping<br />

3 map, <strong>and</strong> I had not noticed that.<br />

4 MS. GOTTSDANKER: Errin, can you flip up the<br />

5 l<strong>and</strong>scape plan so people on the Commission can see it.<br />

6 MR. OVERALL: Mr. Chair, I make a motion that<br />

7 we suggest to the Applicant that they honor the setback<br />

8 of 30 feet. If they come back with a design reason why<br />

9 it doesn't work, perhaps we can justify it, but as of<br />

10 right now, I would suggest a 30-foot setback for each of<br />

11 those three buildings.<br />

12 MR. BIERIG: I think<br />

13 Commissioner Gottsdanker, who does a lot of l<strong>and</strong>scaping,<br />

14 suggested 20 was probably --<br />

15 MS. GOTTSDANKER: I could even live with<br />

16 that.<br />

17 MR. PHILLIPS: Could you screen it at 20?<br />

18 MS. BURROWS: I'm sorry? I missed that.<br />

19 MS. GOTTSDANKER: 15 would be sufficient.<br />

20 But then I don't know -- given that Mr. Caruso has owned<br />

21 the plan has pathways of things. I just want to make<br />

22 sure there's enough room for people -- this is up to you<br />

23 that your clientele be able to get out their doors <strong>and</strong><br />

24 walk around there <strong>and</strong> also be heavily l<strong>and</strong>scaped.<br />

25 MR. OVERALL: I'll try again. I made a<br />

373

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!