1 The 100-year flood plain is at approximately<br />

2 23 feet, <strong>and</strong> we have to build 2 feet above that. And<br />

3 the finished floor of P1, the upper level of the parking<br />

4 garage, is at 25 feet, 6 inches. And without altering<br />

5 the grade of the property significantly to accommodate<br />

6 two levels of parking, the alternative would be to<br />

7 create one vast field of underground parking.<br />

8 We've explored this, <strong>and</strong> we have found that<br />

9 we cannot create nearly as efficient of a parking lot in<br />

10 that configuration nor physical space on the site to<br />

11 reasonably accommodate it.<br />

12 Furthermore, it would also eliminate our<br />

13 ability to have underground occupiable space which is<br />

14 efficient for the operation of the hotel for our guests<br />

15 <strong>and</strong> the visiting public.<br />

16 Let me explain that. By having P1 as<br />

17 occupiable space in its current location, we are able to<br />

18 locate the kitchen there that is in close proximity to<br />

19 the main dining room <strong>and</strong> the media rooms adjacent to the<br />

20 main building. The kitchen in that location is also<br />

21 adjacent to where the cars are parked so room service<br />

22 can be dispatched from a central location on the<br />

23 property. This cannot be accomplished if P1 did not<br />

24 exist as occupiable space.<br />

25 Additionally by having P1 at its current<br />