1 what the variables were that were considered in the<br />

2 prepared hotel in both ITE <strong>and</strong> "UIL" studies, <strong>and</strong> I<br />

3 don't think we have an answer on that yet.<br />

4 MR. CARUSO: Commissioner, we have our<br />

5 traffic engineer here. If you would like, we can have<br />

6 him answer that question for you.<br />

7 MR. OVERALL: Yeah.<br />

8 MR. CARUSO: We did submit the location of<br />

9 fire hydrants to staff. That is in the book. Thank<br />

10 you. Unfortunately not on a large sheet.<br />

11 MS. GOTTSDANKER: It's okay. I can figure it<br />

12 out. There's not too much else there.<br />

13 MR. SHELL: Mr. Chair, Commissioners, good<br />

14 afternoon. I'm Scott Shell with Associated<br />

15 Transportation Engineers. I've got bunch of notes here<br />

16 on traffic <strong>and</strong> parking. I'll start with<br />

17 Commissioner Overall's question.<br />

18 The ITE report was used for the traffic<br />

19 analysis. So that's not to be confused with the ULI<br />

20 shared parking subject. There are two different reports<br />

21 that were used.<br />

22 The ITE report contains studies of hotel<br />

23 facilities that are similar to the Miramar. They have<br />

24 restaurants <strong>and</strong> bars <strong>and</strong> conference facilities,<br />

25 recreational facilities, such as pools <strong>and</strong> fitness<br />

265