1 MS. GOTTSDANKER: That's fine with me. You<br />

2 know, I think -- you know, I think by doing what we just<br />

3 did with the height that's going to impact the grading,<br />

4 <strong>and</strong> I certainly am not going to try to sit here <strong>and</strong> tell<br />

5 anybody how this lot should be graded because that's so<br />

6 complex. It's so much a trade off between the cutting<br />

7 that's being proposed, the "lower buildings on one end<br />

8 <strong>and</strong> bring them up at that end."<br />

9 And also I'm not going to go with no fill<br />

10 because, if they need whatever -- if they need 1,000<br />

11 cubic yards of fill to fill in the hole, well, fine.<br />

12 That's what they need to do it. So I don't think we<br />

13 here -- at least you guys -- <strong>and</strong> it would take me a lot<br />

14 longer to figure out a grading plan that worked to be<br />

15 able to make any conditions like. I don't want to do<br />

16 that.<br />

17 MR. OVERALL: I want to clarify. I'm not<br />

18 making a condition. I was making a suggestion that it<br />

19 would be desirable to comply with our regulations which<br />

20 is to minimize the amount of grading.<br />

21 So I think, to the extent he can justify<br />

22 grading to level out the site, I'm not opposed to that.<br />

23 I would encourage them to try <strong>and</strong> arrive at a plan that<br />

24 doesn't require nearly as much import of fill.<br />

25 MS. GOTTSDANKER: I think we can go right to<br />