01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 should require a subsequent EIR as to topics of impacts<br />

2 on water supply.<br />

3 Likewise, if you consider the material in<br />

4 front of you as not new information of substantial<br />

5 importance or maybe both new information of substantial<br />

6 importance as well as a substantial change in the<br />

7 circumstances under which the <strong>project</strong> would be<br />

8 contracted today, i.e., a different water supply, if you<br />

9 make that determination based on substantial evidence,<br />

10 then you likewise should require a subsequent EIR as to<br />

11 water supply.<br />

12 On the other h<strong>and</strong>, you know, on the whole<br />

13 record in front of you, if you determine that the record<br />

14 provides a firm enough commitment for water supply <strong>and</strong><br />

15 enough analysis of water supply so that further<br />

16 environmental review is not required, then that's the<br />

17 determination you've made, <strong>and</strong> that would be studied<br />

18 under a substantial evidence test by the review court.<br />

19 There may be some follow-on questions from that.<br />

20 MR. BIERIG: I'm being asked that we take a<br />

21 break at this point. How about if we take --<br />

22 MS. BURROWS: Five?<br />

23 MR. BIERIG: We'll do a five-minute break.<br />

24 I'm hoping to come back <strong>and</strong> close the public hearing<br />

25 quickly.<br />

340

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!