1 MS. BLACK: That's clear. Did the Schrager<br />

2 approval consider the development they proposed inside<br />

3 of the railroad easement <strong>and</strong> any use of the <strong>beach</strong>? The<br />

4 answer is yes. So yes, they did consider it. There's a<br />

5 road crossing it. There was l<strong>and</strong>scaping in the railroad<br />

6 easement.<br />

7 MS. GOTTSDANKER: But they did not count it<br />

8 as part of the FAR calculations?<br />

9 MS. BLACK: They did not count it as part of<br />

10 their base parcel for FAR calculation. They did analyze<br />

11 the effects of the use of those parcels in conjunction<br />

12 with the hotel. So I think you were asking both those<br />

13 questions.<br />

14 MS. GOTTSDANKER: I was asking both those<br />

15 questions. Thank you. And I just -- I'll wait until<br />

16 later to say that.<br />

17 MR. BIERIG: Commissioner Burrows.<br />

18 MS. BURROWS: Before we leave the issue of<br />

19 Parcel 6, of counsel I have a question. Would it be<br />

20 correct to say that the methodolgy used by the surveyor<br />

21 <strong>and</strong> by Penfield & Smith that is here today that resulted<br />

22 in the 2.02 number -- is that a legally accepted<br />

23 calculation -- methodolgy, I suppose?<br />

24 MS. SLUTZKY: Mr. Chair,<br />

25 Commissioner Burrows, yes, that's the methodolgy used by<br />