01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 that visually depicts a segment of this.<br />

2 MR. BIERIG: How about Exhibit 5.03M? That<br />

3 might be it. That's not the one. That one's not bad.<br />

4 MR. BRIGGS: This is a good section used for<br />

5 this discussion. This dashed line right here is the<br />

6 existing grade.<br />

7 MR. BIERIG: Right.<br />

8 MS. GOTTSDANKER: So we have 50 percent above<br />

9 existing grade.<br />

10 MS. ALMY: Mr. Chair, Commissioners, I'll<br />

11 import the fact that our height is now measured from<br />

12 finished grade. You can see what finished grade is, <strong>and</strong><br />

13 it surrounds that garage area.<br />

14 MS. BLACK: The definition doesn't talk about<br />

15 existing grade. It's above the average level of the<br />

16 adjoining ground. I think it's finished grade.<br />

17 MR. BIERIG: I think it probably is as well.<br />

18 Finished grade makes sense. But we can look at Jameson<br />

19 as a potential method for measuring from since the rest<br />

20 of it is fill because, if you put a building on top of a<br />

21 hill, you can build it as tall as you want. Let's look<br />

22 at 5.03M.<br />

23 MS. BLACK: I do think it's important, while<br />

24 looking at this, to realize that the definition says<br />

25 "shall be counted as a story if more than one half of<br />

243

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!