01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 make sure we underst<strong>and</strong> that what we're looking at here<br />

2 on this side is 45 feet tall.<br />

3 MS. ALMY: Mr. Chair, I can offer a little<br />

4 information if you want, <strong>and</strong> again, I agree that<br />

5 finished floor is a measure that we need to take into<br />

6 consideration since our current ordinance does measure<br />

7 height from finished grade -- finished grade into<br />

8 consideration.<br />

9 And I think that we all knew, when the new<br />

10 height methodolgy was developed <strong>and</strong> adopted, that there<br />

11 would be instances where this kind of banking would<br />

12 occur.<br />

13 But just for information purposes, the<br />

14 finished floor of garage level P1 is 25.5 feet above<br />

15 mean sea level. The roof is 37 feet. That's a little<br />

16 lower than finished floor of the main lobby. The mid<br />

17 point of the height of P1 31.25, <strong>and</strong> the average grade<br />

18 around it is 33. So the mid point is 31, <strong>and</strong> the<br />

19 average grade around it is 33. So the average grade<br />

20 exceeds the mid point of that basement level.<br />

21 MR. BIERIG: I'm not sure, Ms. Almy --<br />

22 MS. ALMY: That didn't work out, did it?<br />

23 MR. BIERIG: No, I'm not sure what you're<br />

24 trying to tell me.<br />

25 MS. ALMY: I think what I'm trying to look at<br />

246

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!