1 the funding stream is pretty well in place. As far as<br />

2 the time frame, I think we would expect to come to the<br />

3 County Planning Commission <strong>and</strong> the Montecito Planning<br />

4 Commission in the next six months at the longest in a<br />

5 conceptual review framework.<br />

6 Caltrans is at the very beginning stages of<br />

7 preparing environmental documents. They're really doing<br />

8 baseline studies right now to support their analysis <strong>and</strong><br />

9 also doing a lot of engineering work.<br />

10 So I would suspect that that's a year to year<br />

11 <strong>and</strong> a half away, but I don't have that time line<br />

12 embedded in my memory. But yeah, I would expect that<br />

13 it's going to be quite an interesting process. It<br />

14 always is.<br />

15 MR. BIERIG: Well, I think we're done on that<br />

16 course of action.<br />

17 So Director Black or Mr. Briggs, did you want<br />

18 to rebut any of the public comment? I know you've had a<br />

19 few items, but I wanted to give you the opportunity<br />

20 right now.<br />

21 MS. BLACK: Oh, yes. So Mr. Chair, I'll at<br />

22 least start, <strong>and</strong> then if staff recall other things we<br />

23 need to report on, we can do that. I know Mr. Ghizzoni<br />

24 wants to provide you with some input on the CEQA review<br />

25 <strong>and</strong> water issue.<br />