1 actually trying to supplement the supply for them, <strong>and</strong><br />

2 we've actually discussed it in a letter we sent to<br />

3 Caruso Affiliated. It was dated July 29. So the well<br />

4 we originally thought would be on the <strong>project</strong>, it would<br />

5 be used for nonpotable use, <strong>and</strong> it was removed.<br />

6 MR. BIERIG: And those issues related to the<br />

7 deletion of the well did not have anything to do with a<br />

8 request from your district.<br />

9 MR. MOSBY: No, it didn't.<br />

10 MR. BIERIG: Okay. Thank you. Thought I'd<br />

11 make sure.<br />

12 I did notice that you provided a table of the<br />

13 historic use of the Miramar Hotel, <strong>and</strong> I don't remember<br />

14 in all these documents where it is, but it struck me<br />

15 that -- <strong>and</strong> I'm rounding -- the number that's being<br />

16 proposed right now as a baseline number for the hotel is<br />

17 around 45 acre feet of water per year. Is that<br />

18 reasonably accurate?<br />

19 MR. MOSBY: 45 acre feet is the baseline<br />

20 that's calculated by the district.<br />

21 MR. BIERIG: That seemed to differ pretty<br />

22 substantial from the historic use that I saw in the<br />

23 table that was shown, <strong>and</strong> it also differs a lot from<br />

24 Biltmore current use, you know, which seems to be closer<br />

25 to the 45 number.<br />