01.02.2013 Views

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

1 miramar beach resort and bungalows project 2 - Santa Barbara ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1 both the grade, this ranges from 26 1/2 to 31 1/2 above<br />

2 existing grade.<br />

3 MR. BIERIG: Give me that again. Above<br />

4 existing grade is 24?<br />

5 MR. MIDDLEBROOK: Above existing grade it<br />

6 ranges in height because of it's length <strong>and</strong> the change<br />

7 in grade from varying phases 26 1/2 to 31 1/2 feet<br />

8 above.<br />

9 MR. BIERIG: Do you have a section on that<br />

10 building in our plan set?<br />

11 MS. GOTTSDANKER: Yeah, I'm looking for it.<br />

12 MR. MIDDLEBROOK: It's 28 1/2 feet above --<br />

13 MR. BIERIG: I concentrated more on the main<br />

14 building <strong>and</strong> the ballroom.<br />

15 Yeah, I see it here.<br />

16 MS. GOTTSDANKER: You got what it is.<br />

17 MR. BIERIG: It's in 5.13.<br />

18 MS. GOTTSDANKER: 5.13. Oh, 5.13. There it<br />

19 is.<br />

20 MR. PHILLIPS: Mr. Chair, is this the time<br />

21 for design direction, do you think, or is it still<br />

22 questioning?<br />

23 MR. BIERIG: Yeah, we're just trying to<br />

24 figure it out. Are you ready for design direction?<br />

25 MR. PHILLIPS: I don't want to miss an<br />

306

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!