27.06.2013 Views

Proceedings of the 3rd European Conference on Intellectual Capital

Proceedings of the 3rd European Conference on Intellectual Capital

Proceedings of the 3rd European Conference on Intellectual Capital

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Gabriela Atanasiu and Florin Le<strong>on</strong><br />

Stressing <str<strong>on</strong>g>the</str<strong>on</strong>g> self-evaluati<strong>on</strong> stage as a collective exercise for <str<strong>on</strong>g>the</str<strong>on</strong>g> unit under review to ensure <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> appropriate change (this includes academic and administrative staff and<br />

students);<br />

Ensuring a follow-up <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> internal reviews, e.g. implementati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> appropriate<br />

recommendati<strong>on</strong>s and feedback loops into strategic management.<br />

The impact <str<strong>on</strong>g>of</str<strong>on</strong>g> this project <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> team <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Multidisciplinary Centre <str<strong>on</strong>g>of</str<strong>on</strong>g> Structural Engineering & Risk<br />

Management (MCSERM, 2010) was two-fold. On <str<strong>on</strong>g>the</str<strong>on</strong>g> <strong>on</strong>e hand, it allowed <str<strong>on</strong>g>the</str<strong>on</strong>g> enhancing <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

knowledge by learning several aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> project management from o<str<strong>on</strong>g>the</str<strong>on</strong>g>r partners in <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>European</str<strong>on</strong>g><br />

Uni<strong>on</strong>. On <str<strong>on</strong>g>the</str<strong>on</strong>g> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r hand, it allowed <str<strong>on</strong>g>the</str<strong>on</strong>g> individual growing <str<strong>on</strong>g>of</str<strong>on</strong>g> intellectual capital and at <str<strong>on</strong>g>the</str<strong>on</strong>g> same time<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> increase in <str<strong>on</strong>g>the</str<strong>on</strong>g> level <str<strong>on</strong>g>of</str<strong>on</strong>g> intellectual capital <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Centre team.<br />

6. Managing <str<strong>on</strong>g>European</str<strong>on</strong>g> projects in <str<strong>on</strong>g>the</str<strong>on</strong>g> post-accessi<strong>on</strong> phase<br />

The less<strong>on</strong>s learned from <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>European</str<strong>on</strong>g> projects in Romania’s pre-accessi<strong>on</strong> phase proved to be<br />

valuable assets for <str<strong>on</strong>g>the</str<strong>on</strong>g> management <str<strong>on</strong>g>of</str<strong>on</strong>g> projects in <str<strong>on</strong>g>the</str<strong>on</strong>g> post-accessi<strong>on</strong> phase. The individual<br />

accumulati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> knowledge, but also <str<strong>on</strong>g>the</str<strong>on</strong>g> team cohesi<strong>on</strong> and intellectual capital, as <str<strong>on</strong>g>the</str<strong>on</strong>g> sum <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

individual knowledge, increased <str<strong>on</strong>g>the</str<strong>on</strong>g> potential <str<strong>on</strong>g>of</str<strong>on</strong>g> successful managing <str<strong>on</strong>g>of</str<strong>on</strong>g> internati<strong>on</strong>al projects. The<br />

experience earned in managing projects since <str<strong>on</strong>g>the</str<strong>on</strong>g> pre-accessi<strong>on</strong> phased has proved very valuable in<br />

winning <str<strong>on</strong>g>the</str<strong>on</strong>g> participati<strong>on</strong> in projects within <str<strong>on</strong>g>the</str<strong>on</strong>g> FP7 programme.<br />

6.1 EFAST project<br />

The first <str<strong>on</strong>g>European</str<strong>on</strong>g> project currently in executi<strong>on</strong> is EFAST (Design Study <str<strong>on</strong>g>of</str<strong>on</strong>g> a <str<strong>on</strong>g>European</str<strong>on</strong>g> Facility for<br />

Advanced Seismic Testing), a <str<strong>on</strong>g>European</str<strong>on</strong>g> collaborative project that deals with <str<strong>on</strong>g>the</str<strong>on</strong>g> study <str<strong>on</strong>g>of</str<strong>on</strong>g> all aspects<br />

regarding <str<strong>on</strong>g>the</str<strong>on</strong>g> design <str<strong>on</strong>g>of</str<strong>on</strong>g> a major testing facility in Europe that would complement and collaborate with<br />

<str<strong>on</strong>g>the</str<strong>on</strong>g> existing <strong>on</strong>es. Earthquake risk is a major civil protecti<strong>on</strong> issue which is related to mitigati<strong>on</strong><br />

measures for protecting citizens, infrastructures, property and <str<strong>on</strong>g>the</str<strong>on</strong>g> human cultural heritage. Seismic<br />

testing plays a key role for <str<strong>on</strong>g>the</str<strong>on</strong>g> better understanding <str<strong>on</strong>g>of</str<strong>on</strong>g> physical phenomena, <str<strong>on</strong>g>the</str<strong>on</strong>g> validati<strong>on</strong> and<br />

improvement <str<strong>on</strong>g>of</str<strong>on</strong>g> analysis and design methods and for <str<strong>on</strong>g>the</str<strong>on</strong>g> qualificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> sensitive equipment.<br />

Therefore, <str<strong>on</strong>g>the</str<strong>on</strong>g> availability <str<strong>on</strong>g>of</str<strong>on</strong>g> high level experimental facilities is essential to meet <str<strong>on</strong>g>the</str<strong>on</strong>g> objectives <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

earthquake mitigati<strong>on</strong> (EFAST, 2010).<br />

6.2 SERIES project<br />

The sec<strong>on</strong>d <str<strong>on</strong>g>European</str<strong>on</strong>g> project recently gained is SERIES (Seismic Engineering Research<br />

Infrastructure for <str<strong>on</strong>g>European</str<strong>on</strong>g> Synergies). It aims at addressing <str<strong>on</strong>g>the</str<strong>on</strong>g> current situati<strong>on</strong> that <str<strong>on</strong>g>European</str<strong>on</strong>g><br />

seismic engineering research suffers from extreme fragmentati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> research infrastructures (RI)<br />

between countries and limited access to <str<strong>on</strong>g>the</str<strong>on</strong>g>m by <str<strong>on</strong>g>the</str<strong>on</strong>g> S/T community <str<strong>on</strong>g>of</str<strong>on</strong>g> earthquake engineering,<br />

especially that <str<strong>on</strong>g>of</str<strong>on</strong>g> Europe’s most seismic regi<strong>on</strong>s. Therefore, <str<strong>on</strong>g>the</str<strong>on</strong>g> project is a c<strong>on</strong>sortium <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> 23 key<br />

actors in Europe’s seismic engineering research, including 3 industrial beneficiaries. The scope<br />

covers all aspects <str<strong>on</strong>g>of</str<strong>on</strong>g> seismic engineering testing, from eight reacti<strong>on</strong> wall pseudodynamic (PsD)<br />

facilities and ten shake table labs, to EU’s unique tester <str<strong>on</strong>g>of</str<strong>on</strong>g> bearings or isolators, its two major<br />

centrifuges and an instrumented site for wave propagati<strong>on</strong> studies. Transnati<strong>on</strong>al access is <str<strong>on</strong>g>of</str<strong>on</strong>g>fered to<br />

a portfolio <str<strong>on</strong>g>of</str<strong>on</strong>g> world class RIs: EU’s largest PsD facility, four diverse shake tables and <str<strong>on</strong>g>the</str<strong>on</strong>g> two<br />

centrifuges. Networking sets up a public distributed database <str<strong>on</strong>g>of</str<strong>on</strong>g> past, present and future test results,<br />

installs distributed testing capabilities at all PsD labs, fostering development <str<strong>on</strong>g>of</str<strong>on</strong>g> up-and-coming <strong>on</strong>es at<br />

Europe’s most seismic regi<strong>on</strong>s, drafts and applies protocols for qualificati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> RIs and engages <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

entire <str<strong>on</strong>g>European</str<strong>on</strong>g> community <str<strong>on</strong>g>of</str<strong>on</strong>g> earthquake engineering via <str<strong>on</strong>g>the</str<strong>on</strong>g> best possible instances: <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>European</str<strong>on</strong>g><br />

Associati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Earthquake Engineering, EU’s seismic code makers and <str<strong>on</strong>g>the</str<strong>on</strong>g>ir nati<strong>on</strong>al groups, <str<strong>on</strong>g>the</str<strong>on</strong>g><br />

<str<strong>on</strong>g>European</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> industry, as well as all relevant S/T associati<strong>on</strong>s or networks. Joint research<br />

engages all labs, exploring and prototyping novel actuators (combinati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> electro-dynamic and<br />

hydraulic <strong>on</strong>es) for better c<strong>on</strong>trol <str<strong>on</strong>g>of</str<strong>on</strong>g> fast tests or special applicati<strong>on</strong>s, new sensing and instrumentati<strong>on</strong><br />

systems, data assimilati<strong>on</strong> in equipment-specimen models for better test c<strong>on</strong>trol and optimisati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g><br />

testing campaigns, as well as experimental studies <str<strong>on</strong>g>of</str<strong>on</strong>g> soil-structure interacti<strong>on</strong> at all types <str<strong>on</strong>g>of</str<strong>on</strong>g> testing<br />

facilities (SERIES, 2010).<br />

Recently in <str<strong>on</strong>g>the</str<strong>on</strong>g> spring <str<strong>on</strong>g>of</str<strong>on</strong>g> 2010, within <str<strong>on</strong>g>the</str<strong>on</strong>g> internal evaluati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> research centres <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> Technical<br />

University <str<strong>on</strong>g>of</str<strong>on</strong>g> Iaşi, TUIASI, several success factors were revealed for our centre, <str<strong>on</strong>g>the</str<strong>on</strong>g> Multidisciplinary<br />

Centre <str<strong>on</strong>g>of</str<strong>on</strong>g> Structural Engineering & Risk Management, in terms <str<strong>on</strong>g>of</str<strong>on</strong>g> growing <str<strong>on</strong>g>the</str<strong>on</strong>g> number <str<strong>on</strong>g>of</str<strong>on</strong>g> ISI-indexed<br />

scientific papers to 25 in 2010, <str<strong>on</strong>g>the</str<strong>on</strong>g> successful entering in <str<strong>on</strong>g>the</str<strong>on</strong>g> FP7 programme <str<strong>on</strong>g>of</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>European</str<strong>on</strong>g><br />

Commissi<strong>on</strong> by gaining <str<strong>on</strong>g>the</str<strong>on</strong>g> two FP7 projects, and also o<str<strong>on</strong>g>the</str<strong>on</strong>g>r two <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> nati<strong>on</strong>al level, a successful<br />

59

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!