09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNBUNDLED NETWORK ELEMENTS - <strong>South</strong> <strong>Carolina</strong><br />

CATEGORY RATE ELEMENTS<br />

Interi<br />

m<br />

Zone BCS USOC<br />

Rec<br />

Nonrecurring<br />

First Add'l<br />

Nonrecurring Disconnect<br />

First Add'l SOMEC SOMAN<br />

OSS Rates($)<br />

SOMAN SOMAN SOMAN SOMAN<br />

CLEC to CLEC Conversion Charge Without Outside Dispatch<br />

(UVL-SL1)<br />

Unbundled Voice Loop, Non-Design Voice Loop, billing for BST<br />

UEANL UREWO 15.81 8.96<br />

providing make-up (Engineering Information - E.I. ) UEANL UEANM 13.47 13.47<br />

Manual Order Coordination for UVL-SL1s (per loop)<br />

2-WIRE Unbundled COPPER LOOP<br />

UEANL UEAMC 8.17 8.17<br />

2-Wire Unbundled Copper Loop - Non-Designed Zone 1 1 UEQ UEQ2X 12.94 36.40 16.10 22.66 4.42<br />

2 Wire Unbundled Copper Loop - Non-Designed - Zone 2 2 UEQ UEQ2X 14.51 36.40 16.10 22.66 4.42<br />

2 Wire Unbundled Copper Loop - Non-Designed - Zone 3<br />

Unbundled Miscellaneous Rate Element, Tag Loop at End User<br />

3 UEQ UEQ2X 15.02 36.40 16.10 22.66 4.42<br />

Premise<br />

Manual Order Coordination 2 Wire Unbundled Copper Loop -<br />

UEQ URETL 8.95 0.88<br />

Non-Designed (per loop)<br />

Unbundled Copper Loop, Non-Design Copper Loop, billing for<br />

UEQ USBMC 8.17 8.17<br />

BST providing make-up (Engineering Information - E.I.) UEQ UEQMU 13.47 13.47<br />

Loop Testing - Basic 1st Half Hour UEQ URET1 34.23 0.00<br />

Loop Testing - Basic Additional Half Hour<br />

CLEC to CLEC Conversion Charge Without Outside Dispatch<br />

UEQ URETA 19.90 19.90<br />

(UCL-ND)<br />

UNBUNDLED EXCHANGE ACCESS LOOP<br />

2-WIRE ANALOG VOICE GRADE LOOP<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Loop or<br />

UEQ UREWO 14.30 7.45<br />

Ground Start Signaling - Zone 1<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Loop or<br />

1 UEA, N<strong>TC</strong>VG UEAL2 16.68 105.98 68.43 53.05 10.61<br />

Ground Start Signaling - Zone 2<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Loop or<br />

2 UEA, N<strong>TC</strong>VG UEAL2 23.13 105.98 68.43 53.05 10.61<br />

Ground Start Signaling - Zone 3<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Reverse<br />

3 UEA, N<strong>TC</strong>VG UEAL2 28.46 105.98 68.43 53.05 10.61<br />

Battery Signaling - Zone 1<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Reverse<br />

1 UEA, N<strong>TC</strong>VG UEAR2 16.68 105.98 68.43 53.05 10.61<br />

Battery Signaling - Zone 2<br />

2-Wire Analog Voice Grade Loop - Service Level 2 w/Reverse<br />

2 UEA, N<strong>TC</strong>VG UEAR2 23.13 105.98 68.43 53.05 10.61<br />

Battery Signaling - Zone 3<br />

Switch-As-Is Conversion rate per UNE Loop, Single LSR, (per<br />

3 UEA, N<strong>TC</strong>VG UEAR2 28.46 105.98 68.43 53.05 10.61<br />

DS0)<br />

Switch-As-Is Conversion rate per UNE Loop, Spreadsheet, (per<br />

UEA, N<strong>TC</strong>VG URESL 21.91 3.15<br />

DS0) UEA, N<strong>TC</strong>VG URESP 23.32 4.56<br />

CLEC to CLEC Conversion Charge without outside dispatch UEA, N<strong>TC</strong>VG UREWO 87.90 36.44<br />

Loop Tagging - Service Level 2 (SL2)<br />

4-WIRE ANALOG VOICE GRADE LOOP<br />

UEA, N<strong>TC</strong>VG URETL 11.24 1.10<br />

4-Wire Analog Voice Grade Loop - Zone 1 1 UEA, N<strong>TC</strong>VG UEAL4 32.59 132.38 94.83 59.35 14.61<br />

4-Wire Analog Voice Grade Loop - Zone 2 2 UEA, N<strong>TC</strong>VG UEAL4 43.89 132.38 94.83 59.35 14.61<br />

4-Wire Analog Voice Grade Loop - Zone 3<br />

Switch-As-Is Conversion rate per UNE Loop, Single LSR, (per<br />

3 UEA, N<strong>TC</strong>VG UEAL4 43.38 132.38 94.83 59.35 14.61<br />

DS0)<br />

Switch-As-Is Conversion rate per UNE Loop, Spreadsheet, (per<br />

UEA, N<strong>TC</strong>VG URESL 21.91 3.15<br />

DS0) UEA, N<strong>TC</strong>VG URESP 23.32 4.56<br />

CLEC to CLEC Conversion Charge without outside dispatch<br />

2-WIRE ISDN DIGITAL GRADE LOOP<br />

UEA, N<strong>TC</strong>VG UREWO 87.90 36.44<br />

2-Wire ISDN Digital Grade Loop - Zone 1 1 UDN U1L2X 25.21 117.58 80.03 53.05 10.61<br />

2-Wire ISDN Digital Grade Loop - Zone 2 2 UDN U1L2X 32.76 117.58 80.03 53.05 10.61<br />

2-Wire ISDN Digital Grade Loop - Zone 3 3 UDN U1L2X 37.70 117.58 80.03 53.05 10.61<br />

CLEC to CLEC Conversion Charge without outside dispatch UDN UREWO 91.82 44.25<br />

2-WIRE ASYMMETRICAL DIGITAL SUBSCRIBER LINE (ADSL) COMPATIBLE LOOP<br />

2 Wire Unbundled ADSL Loop including manual service inquiry<br />

& facility reservation - Zone 1<br />

2 Wire Unbundled ADSL Loop including manual service inquiry<br />

1 UAL UAL2X 12.19 120.84 70.56 50.37 7.93<br />

& facility reservation - Zone 2 2 UAL UAL2X 13.71 120.84 70.56 50.37 7.93<br />

RATES($)<br />

Svc Order<br />

Submitted<br />

Elec<br />

per LSR<br />

Svc Order<br />

Submitted<br />

Manually<br />

per LSR<br />

Attachment: 2 Exh. A<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

1st<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Add'l<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc 1st<br />

Version: 2Q05 Standard ICA 07/06/05 (New CLECs) Page 2 of 15<br />

CCCS 160 of 433<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc Add'l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!