09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNBUNDLED NETWORK ELEMENTS - <strong>South</strong> <strong>Carolina</strong><br />

CATEGORY RATE ELEMENTS<br />

Interi<br />

m<br />

Zone BCS USOC<br />

RATES($)<br />

Svc Order<br />

Submitted<br />

Elec<br />

per LSR<br />

Svc Order<br />

Submitted<br />

Manually<br />

per LSR<br />

Attachment: 2 Exh. A<br />

Rec<br />

Nonrecurring<br />

First Add'l<br />

Nonrecurring Disconnect<br />

First Add'l SOMEC SOMAN<br />

OSS Rates($)<br />

SOMAN SOMAN SOMAN SOMAN<br />

4 Wire Unbundled Digital Loop 56 Kbps - Zone 1 1 UDL, N<strong>TC</strong>UD UDL56 29.93 126.66 89.12 59.35 14.61<br />

4 Wire Unbundled Digital Loop 56 Kbps - Zone 2 2 UDL, N<strong>TC</strong>UD UDL56 33.99 126.66 89.12 59.35 14.61<br />

4 Wire Unbundled Digital Loop 56 Kbps - Zone 3 3 UDL, N<strong>TC</strong>UD UDL56 34.74 126.66 89.12 59.35 14.61<br />

4 Wire Unbundled Digital Loop 64 Kbps - Zone 1 1 UDL, N<strong>TC</strong>UD UDL64 29.93 126.66 89.12 59.35 14.61<br />

4 Wire Unbundled Digital Loop 64 Kbps - Zone 2 2 UDL, N<strong>TC</strong>UD UDL64 33.99 126.66 89.12 59.35 14.61<br />

4 Wire Unbundled Digital Loop 64 Kbps - Zone 3<br />

Switch-As-Is Conversion rate per UNE Loop, Single LSR, (per<br />

3 UDL, N<strong>TC</strong>UD UDL64 34.74 126.66 89.12 59.35 14.61<br />

DS0)<br />

Switch-As-Is Conversion rate per UNE Loop, Spreadsheet, (per<br />

UDL, N<strong>TC</strong>UD URESL 21.91 3.15<br />

DS0) UDL, N<strong>TC</strong>UD URESP 23.32 4.56<br />

CLEC to CLEC Conversion Charge without outside dispatch<br />

2-WIRE Unbundled COPPER LOOP<br />

2-Wire Unbundled Copper Loop-Designed including manual<br />

UDL, N<strong>TC</strong>UD UREWO 102.34 49.85<br />

service inquiry & facility reservation - Zone 1<br />

2-Wire Unbundled Copper Loop-Designed including manual<br />

1 UCL UCLPB 12.19 119.91 69.62 50.37 7.93<br />

service inquiry & facility reservation - Zone 2<br />

2 Wire Unbundled Copper Loop-Designed including manual<br />

2 UCL UCLPB 13.71 119.91 69.62 50.37 7.93<br />

service inquiry & facility reservation - Zone 3<br />

2-Wire Unbundled Copper Loop-Designed without manual<br />

3 UCL UCLPB 14.14 119.91 69.62 50.37 7.93<br />

service inquiry and facility reservation - Zone 1<br />

2-Wire Unbundled Copper Loop-Designed without manual<br />

1 UCL UCLPW 12.19 94.87 56.89 50.37 7.93<br />

service inquiry and facility reservation - Zone 2<br />

2-Wire Unbundled Copper Loop-Designed without manual<br />

2 UCL UCLPW 13.71 94.87 56.89 50.37 7.93<br />

service inquiry and facility reservation - Zone 3<br />

CLEC to CLEC Conversion Charge without outside dispatch<br />

3 UCL UCLPW 14.14 94.87 56.89 50.37 7.93<br />

(UCL-Des)<br />

4-WIRE COPPER LOOP<br />

4-Wire Copper Loop-Designed including manual service inquiry<br />

UCL UREWO 94.87 42.57<br />

and facility reservation - Zone 1<br />

4-Wire Copper Loop-Designed including manual service inquiry<br />

1 UCL UCL4S 19.64 144.17 93.88 55.12 10.38<br />

and facility reservation - Zone 2<br />

4-Wire Copper Loop-Designed including manual service inquiry<br />

2 UCL UCL4S 20.90 144.17 93.88 55.12 10.38<br />

and facility reservation - Zone 3<br />

4-Wire Copper Loop-Designed without manual service inquiry<br />

3 UCL UCL4S 19.34 144.17 93.88 55.12 10.38<br />

and facility reservation - Zone 1<br />

4-Wire Copper Loop-Designed without manual service inquiry<br />

1 UCL UCL4W 19.64 119.13 81.15 55.12 10.38<br />

and facility reservation - Zone 2<br />

4-Wire Copper Loop-Designed without manual service inquiry<br />

2 UCL UCL4W 20.90 119.13 81.15 55.12 10.38<br />

and facility reservation - Zone 3<br />

CLEC to CLEC Conversion Charge without outside dispatch<br />

3 UCL UCL4W 19.34 119.13 81.15 55.12 10.38<br />

(UCL-Des) UCL UREWO 94.87 42.57<br />

Order Coordination for Unbundled Copper Loops (per loop) UCL<br />

UEA, UDN, UAL,<br />

UHL, UDL, N<strong>TC</strong>VG,<br />

N<strong>TC</strong>UD, USL,<br />

UCLMC 8.17 8.17<br />

Order Coordination for Specified Conversion Time (per LSR)<br />

LOOP MODIFICATION<br />

N<strong>TC</strong>D1, UEANL<br />

UAL, UHL, UCL,<br />

UEQ, ULS, UEA,<br />

OCOSL 18.13<br />

Unbundled Loop Modification, Removal of Load Coils - 2 Wire<br />

UEANL, UEPSR,<br />

pair less than or equal to 18k ft, per Unbundled Loop<br />

Unbundled Loop Modification Removal of Load Coils - 4 Wire<br />

UEPSB ULM2L 32.46 32.46<br />

less than or equal to 18K ft, per Unbundled Loop UHL, UCL, UEA<br />

UAL, UHL, UCL,<br />

UEQ, ULS, UEA,<br />

ULM4L 32.46 32.46<br />

Unbundled Loop Modification Removal of Bridged Tap Removal,<br />

UEANL, UEPSR,<br />

per unbundled loop<br />

SUB-LOOPS<br />

Sub-Loop Distribution<br />

UEPSB ULMBT 32.48 32.48<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

1st<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Add'l<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc 1st<br />

Version: 2Q05 Standard ICA 07/06/05 (New CLECs) Page 4 of 15<br />

CCCS 162 of 433<br />

<strong>Inc</strong>remental<br />

Charge -<br />

Manual Svc<br />

Order vs.<br />

Electronic-<br />

Disc Add'l

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!