09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Version 2Q03: 07/21/03-<strong>TC</strong> SYSTEMS AL<br />

Attachment 4-Central Office<br />

Page 27<br />

specific future uses for which the space has been reserved. Subject to an appropriate<br />

nondisclosure agreement or provision, Bell<strong>South</strong> shall permit <strong>TC</strong> SYSTEMS to<br />

inspect any floor plans or diagrams that Bell<strong>South</strong> provides to the Commission.<br />

6.8 Waiting List. On a first-come, first-served basis, which is governed by the date of<br />

receipt of an application or Letter of Intent, Bell<strong>South</strong> will maintain a waiting list of<br />

requesting telecommunication carriers that have either received a Denial of<br />

Application or, where it is publicly known that the Bell<strong>South</strong> Premises is out of space,<br />

have submitted a Letter of Intent to collocate in that Bell<strong>South</strong> Premises. Bell<strong>South</strong><br />

will notify each telecommunication carrier on the waiting list that can be<br />

accommodated by the amount of space that becomes available, according to the<br />

position of the telecommunication carrier on said waiting list.<br />

6.8.1 When physical Collocation Space becomes available, <strong>TC</strong> SYSTEMS must submit an<br />

updated, complete, and accurate application to Bell<strong>South</strong> within thirty (30) calendar<br />

days of notification by Bell<strong>South</strong> that physical Collocation Space will be available in<br />

the requested Bell<strong>South</strong> Premises previously out of space. If <strong>TC</strong> SYSTEMS has<br />

originally requested caged Collocation Space and cageless Collocation Space becomes<br />

available, <strong>TC</strong> SYSTEMS may refuse such space and notify Bell<strong>South</strong> in writing within<br />

the thirty (30) day timeframe that <strong>TC</strong> SYSTEMS wants to maintain its place on the<br />

waiting list for caged Physical Collocation Space, without accepting the available<br />

cageless Collocation Space.<br />

6.8.1.1 <strong>TC</strong> SYSTEMS may accept an amount of space less than what it originally requested<br />

by submitting an application as set forth above, and upon request, may maintain its<br />

position on the waiting list for the remaining space that was initially requested. If <strong>TC</strong><br />

SYSTEMS does not submit an application or notify Bell<strong>South</strong> in writing as described<br />

above, Bell<strong>South</strong> will offer the space to the next telecommunication carrier on the<br />

waiting list and remove <strong>TC</strong> SYSTEMS from the waiting list. Upon request, Bell<strong>South</strong><br />

will advise <strong>TC</strong> SYSTEMS as to its position on the waiting list.<br />

6.9 Public Notification. Bell<strong>South</strong> will maintain on its Interconnection Services website a<br />

notification document that will indicate all Bell<strong>South</strong> Premises that are without<br />

available space. Bell<strong>South</strong> shall update such document within ten (10) calendar days<br />

of the date that Bell<strong>South</strong> becomes aware that insufficient space is available to<br />

accommodate physical collocation. Bell<strong>South</strong> will also post a document on its<br />

Interconnection Services website that contains a general notice when space becomes<br />

available in a Bell<strong>South</strong> Premises previously on the space exhaust list.<br />

6.10 Application Response.<br />

6.10.1 When space has been determined to be available for physical (caged or cageless)<br />

arrangements, Bell<strong>South</strong> will provide an Application Response within twenty (20)<br />

calendar days of receipt of a Bona Fide Application. The Application Response will<br />

include, at a minimum, the configuration of the space, the Cable Installation Fee, Cable<br />

CCCS 253 of 433

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!