09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Version 3Q03: 11/12/2003<br />

BST 09/29/05 AL<br />

Attachment 2<br />

Page 16<br />

billed in addition to the OC charge. <strong>TC</strong> SYSTEMS may specify a time between<br />

9:00 a.m. and 4:00 p.m. (location time) Monday through Friday (excluding<br />

holidays). If <strong>TC</strong> SYSTEMS specifies a time outside this window, or selects a time<br />

or quantity of Loops that requires Bell<strong>South</strong> technicians to work outside normal<br />

work hours, overtime charges will apply in addition to the OC and OC-TS charges.<br />

Overtime charges will be applied based on the amount of overtime worked and in<br />

accordance with the rates established in the Access Services Tariff, Section E13.2,<br />

for each state. The OC-TS charges for an order due on the same day at the same<br />

location will be applied on a per Local Service Request (LSR) basis.<br />

2.1.8 CLEC to CLEC Conversions for Unbundled Loops<br />

2.1.8.1 The CLEC to CLEC conversion process for unbundled Loops may be used by <strong>TC</strong><br />

SYSTEMS when converting an existing unbundled Loop from another CLEC for<br />

the same end user. The Loop type being converted must be included in <strong>TC</strong><br />

SYSTEMS’s Interconnection Agreement before requesting a conversion.<br />

2.1.8.2 To utilize the CLEC to CLEC conversion process, the Loop being converted must<br />

be the same Loop type with no requested changes to the Loop, must serve the<br />

same end user location from the same serving wire center, and must not require an<br />

outside dispatch to provision.<br />

2.1.8.3 The Loops converted to <strong>TC</strong> SYSTEMS pursuant to the CLEC to CLEC<br />

conversion process shall be provisioned in the same manner and with the same<br />

functionality and options as described in this Attachment for the specific Loop<br />

type, with the exception of LNP, over which Bell<strong>South</strong> has no control in a CLEC<br />

to CLEC loop conversion. Such conversions shall be done in an interval no longer<br />

than conversions from a CLEC to Bell<strong>South</strong> (i.e., winback).<br />

2.1.8.4<br />

SL-1<br />

(Non-<br />

Designed)<br />

UCL-ND<br />

(Non-<br />

Order<br />

Coordination<br />

(OC)<br />

Chargeable<br />

Option<br />

Chargeable<br />

Option<br />

Order Coordination<br />

– Time Specific<br />

(OC-TS)<br />

Chargeable Option Not<br />

available<br />

Not Available Not<br />

Available<br />

CCCS 97 of 433<br />

Test Points DLR Charge for Dispatch<br />

and Testing if No<br />

Trouble Found<br />

Chargeable<br />

Option –<br />

ordered as<br />

Engineering<br />

Information<br />

Document<br />

Chargeable<br />

Option –<br />

ordered as<br />

Charged for Dispatch<br />

inside and outside<br />

Central Office<br />

Charged for Dispatch<br />

inside and outside

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!