09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Version 2Q03: 07/21/03-<strong>TC</strong> SYSTEMS AL<br />

Attachment 4-Central Office<br />

Page 19<br />

testing procedures up to the termination blocks on the MDF where the <strong>TC</strong> SYSTEMS<br />

wiring terminates. The right to engage in such testing shall extend to the entire existing<br />

Bell<strong>South</strong> CO facility inventory of <strong>TC</strong> SYSTEMS intra-office wiring. This testing<br />

shall be performed by an <strong>TC</strong> SYSTEMS technician, or by a Bell<strong>South</strong> Certified<br />

Vendor. The verification and testing process may occur at any time after the delivery<br />

of the <strong>TC</strong> SYSTEMS collocation space.<br />

5.12.1.1 The testing procedures to be performed by the <strong>TC</strong> SYSTEMS Technician or <strong>TC</strong><br />

SYSTEMS’s Bell<strong>South</strong> Certified Supplier shall include verification and testing of all<br />

power feeds associated with the intra-office wiring for the purpose of determining<br />

BDFB power feed assignments, BDFB relay rack number, BDFB panel, fuse #,<br />

drain/load (amps), and fuse size (amps). Whenever <strong>TC</strong> SYSTEMS is responsible for<br />

either the installation, testing and/or maintenance of any power feeds that directly<br />

connects the <strong>TC</strong> SYSTEMS collocation space to the Bell<strong>South</strong> BDFB, these testing<br />

procedures will include verification and testing of all power feeds associated with the<br />

intra-office wiring for the purpose of determining BDFB power feed assignments,<br />

BDFB relay rack number, BDFB panel, fuse #, drain/load (amps), and fuse size<br />

(amps). This testing shall be performed by an <strong>TC</strong> SYSTEMS Technician, or by a<br />

Bell<strong>South</strong> Certified Supplier. The verification and testing process may occur at any<br />

time after the delivery of the <strong>TC</strong> SYSTEMS collocation space.<br />

5.12.1.2 The <strong>TC</strong> SYSTEMS Technician or <strong>TC</strong> SYSTEMS’s Bell<strong>South</strong> Certified Supplier will<br />

prepare a Method of Procedure (“MOP”) per TR73503 and coordinate with the local<br />

Bell<strong>South</strong> Network Operations for the Bell<strong>South</strong> Premises to obtain access to the<br />

front of the Bell<strong>South</strong> Common BDFB serving <strong>TC</strong> SYSTEMS’s Collocation Space.<br />

<strong>TC</strong> SYSTEMS’s Technician or its Bell<strong>South</strong> Certified Supplier may operate the meter<br />

on the front of the BDFB to verify that the BDFB load(s) are within the engineered<br />

maximum load of 80% of the serving circuit breaker size (generally 180 Amps for a<br />

225 Amp breaker). If <strong>TC</strong> SYSTEMS’s Technician or <strong>TC</strong> SYSTEMS’s Bell<strong>South</strong><br />

Certified Supplier discovers a load in excess of 67% of the serving circuit breaker size<br />

(generally 150 Amps for a 225 Amp breaker), <strong>TC</strong> SYSTEMS agrees to notify<br />

Bell<strong>South</strong>. Notification may be directed to the local Bell<strong>South</strong> Network Operations<br />

for the Bell<strong>South</strong> Premises, as well as to the Bell<strong>South</strong> Account Representative<br />

assigned to <strong>TC</strong> SYSTEMS, via e-mail. <strong>TC</strong> SYSTEMS’s Technician or <strong>TC</strong><br />

SYSTEMS’s Bell<strong>South</strong> Certified Supplier will not attempt to verify the BDFB meter<br />

reading via any other means, such as the use of a clamp-on ammeter. <strong>TC</strong> SYSTEMS’s<br />

Technician or <strong>TC</strong> SYSTEMS’s Bell<strong>South</strong> Certified Supplier is not permitted to verify<br />

rectifier capacity, battery reserve, circuit breaker sizes, etc., that would require access<br />

to Bell<strong>South</strong>’s main power room.<br />

5.12.2 <strong>TC</strong> SYSTEMS shall have access to the demarcation point and all equipment and<br />

facilities on its side of the demarcation point. <strong>TC</strong> SYSTEMS shall not have access to<br />

Bell<strong>South</strong>’s side of the demarcation point. When troubles cannot be clearly isolated to<br />

Bell<strong>South</strong>’s facilities and equipment, Bell<strong>South</strong> will agree to test cooperatively with<br />

<strong>TC</strong> SYSTEMS to assist in trouble isolation to a specific Party’s facilities and<br />

equipment as set forth in Section 2.3.13 of Bell<strong>South</strong>’s FCC Tariff No. 1. If <strong>TC</strong><br />

CCCS 245 of 433

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!