09.08.2013 Views

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

TC Systems, Inc. South Carolina - AT&T Clec Online

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Version 2Q03: 07/21/03-<strong>TC</strong> SYSTEMS AL<br />

Attachment 4-Central Office<br />

Page 5<br />

requested and the measures Bell<strong>South</strong> is taking to make additional space available for<br />

collocation arrangements. A Space Availability Report does not reserve space at the<br />

Bell<strong>South</strong> Premises for which the Space Availability Report was requested by <strong>TC</strong><br />

SYSTEMS.<br />

The request from <strong>TC</strong> SYSTEMS for a Space Availability Report must be in writing<br />

and include the Bell<strong>South</strong> Premises street address, as identified in the Local Exchange<br />

Routing Guide (LERG) and Common Language Location Identification (CLLI) code<br />

of the Bell<strong>South</strong> Premises. CLLI code information is located in the National<br />

Exchange Carrier Association (NECA) Tariff FCC No. 4.<br />

2.1.2 Bell<strong>South</strong> will respond to a request for a Space Availability Report for a particular<br />

Bell<strong>South</strong> Premises within ten (10) calendar days of receipt of such request.<br />

Bell<strong>South</strong> will respond in ten (10) calendar days to a request for a Space Availability<br />

Report for up to and including five (5) Bell<strong>South</strong> Premises within the same state. The<br />

response time for a request for a Space Availability Report of more than five (5)<br />

Bell<strong>South</strong> Premises shall be negotiated between the Parties. If Bell<strong>South</strong> cannot meet<br />

the ten (10) calendar-day response time, Bell<strong>South</strong> shall notify <strong>TC</strong> SYSTEMS and<br />

inform <strong>TC</strong> SYSTEMS of the time frame under which it can respond.<br />

3. Collocation Options<br />

3.1 Cageless. Bell<strong>South</strong> shall allow <strong>TC</strong> SYSTEMS to collocate <strong>TC</strong> SYSTEMS’s<br />

equipment and facilities without requiring the construction of a cage or similar<br />

structure. Bell<strong>South</strong> shall allow <strong>TC</strong> SYSTEMS to have direct access to <strong>TC</strong><br />

SYSTEMS’s equipment and facilities in accordance with Section 5.9. Bell<strong>South</strong> shall<br />

make cageless collocation available in single bay increments. Except where <strong>TC</strong><br />

SYSTEMS’s equipment requires special technical considerations (e.g., special cable<br />

racking or isolated ground plane), Bell<strong>South</strong> shall assign cageless Collocation Space in<br />

conventional equipment rack lineups where feasible. For equipment requiring special<br />

technical considerations, <strong>TC</strong> SYSTEMS must provide the equipment layout, including<br />

spatial dimensions for such equipment pursuant to generic requirements contained in<br />

Telcordia GR-63-Core, and shall be responsible for compliance with all special<br />

technical requirements associated with such equipment.<br />

3.2 Caged. At <strong>TC</strong> SYSTEMS’s expense, <strong>TC</strong> SYSTEMS will arrange with a Supplier<br />

certified by Bell<strong>South</strong> (Bell<strong>South</strong> Certified Supplier) to construct a collocation<br />

arrangement enclosure in accordance with Bell<strong>South</strong>’s Technical References (TRs)<br />

(hereinafter referred to as Specifications) prior to starting equipment installation.<br />

Bell<strong>South</strong> will provide Specifications upon request. Where local building codes<br />

require enclosure specifications more stringent than Bell<strong>South</strong>’s enclosure<br />

Specifications, <strong>TC</strong> SYSTEMS and <strong>TC</strong> SYSTEMS’s Bell<strong>South</strong> Certified Supplier must<br />

comply with the more stringent local building code requirements. <strong>TC</strong> SYSTEMS’s<br />

Bell<strong>South</strong> Certified Supplier shall be responsible for filing and obtaining any and all<br />

necessary permits and/or licenses for such construction. Bell<strong>South</strong> shall cooperate<br />

CCCS 231 of 433

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!