Version 2Q03: 07/21/03-<strong>TC</strong> SYSTEMS AL<br />

Attachment 4-Central Office<br />

Page 28<br />

Records Fee, and any other applicable space preparation fees, as described in Section<br />

8.<br />

6.11 Application Modifications.<br />

6.11.1 If a modification or revision is made to any information in the Bona Fide Application<br />

prior to a BFFO, with the exception of modifications to (1) Customer Information, (2)<br />

Contact Information or (3) Billing Contact Information, the application shall be<br />

considered a new application and handled as a new application with respect to the<br />

response and provisioning intervals. Bell<strong>South</strong> will charge <strong>TC</strong> SYSTEMS the<br />

appropriate application fee associated with the level of assessment performed by<br />

Bell<strong>South</strong>. The fee paid by <strong>TC</strong> SYSTEMS, if any, for its request to modify the use of<br />

the Collocation Space shall be dependent upon the modification requested as set forth<br />

in Section 6.3.1 of this Attachment.<br />

6.12 Bona Fide Firm Order.<br />

6.12.1 <strong>TC</strong> SYSTEMS shall indicate its intent to proceed with equipment installation in a<br />

Bell<strong>South</strong> Premises by submitting a Bona Fide Firm Order (BFFO) to Bell<strong>South</strong>. The<br />

BFFO must be received by Bell<strong>South</strong> no later than thirty (30) calendar days after<br />

Bell<strong>South</strong>’s Application Response to <strong>TC</strong> SYSTEMS’s Bona Fide Application or <strong>TC</strong><br />

SYSTEMS’s application will expire.<br />

6.12.2 The firm order date will be the date Bell<strong>South</strong> is in receipt of <strong>TC</strong> SYSTEMS’s BFFO.<br />

Bell<strong>South</strong> will acknowledge the receipt of <strong>TC</strong> SYSTEMS’s BFFO within seven (7)<br />

calendar days of receipt, so that <strong>TC</strong> SYSTEMS will have positive confirmation from<br />

Bell<strong>South</strong> that its BFFO has been received. Bell<strong>South</strong>’s response to a BFFO will<br />

include a Firm Order Confirmation, which contains the firm order date. No revisions<br />

can be made to a BFFO.<br />

7. Construction and Provisioning<br />

7.1 Construction and Provisioning Intervals.<br />

7.1.1 Bell<strong>South</strong> will complete construction for physical caged Collocation Space under<br />

ordinary conditions as soon as possible within a maximum of ninety (90) calendar days<br />

from receipt of a BFFO or as agreed to by the Parties. Bell<strong>South</strong> will complete<br />

construction for physical cageless Collocation Space under ordinary conditions as<br />

soon as possible within a maximum of sixty (60) calendar days from receipt of a BFFO<br />

and ninety (90) calendar days from receipt of a BFFO for extraordinary conditions, or<br />

as agreed to by the Parties. Ordinary conditions are defined as space available with<br />

only minor changes required to Bell<strong>South</strong>’s support systems (Examples include, but<br />

are not limited to: minor modifications to HVAC, cabling and Bell<strong>South</strong>’s power<br />

plant). Extraordinary conditions include, but may not be limited to: major Bell<strong>South</strong><br />

equipment rearrangements or additions; power plant additions or upgrades; major<br />

mechanical additions or upgrades; major upgrades for ADA compliance;<br />

CCCS 254 of 433