“[a]ttribution of savings from codes and standards should be evaluated on a case‐by‐case basis”<br />

and that “the attribution rate should reflect the level of support for market transformation”,<br />

39<br />

arguing that Terasen’s “position on attribution goes against this approach.” (BC Hydro Argument, p.<br />

17)<br />

BCOAPO states “. . . the DSM regulation 4(7) allows for the Commission to include a proportion of<br />

the benefit that, in the Commission’s opinion (not the Applicant’s) will increase market share only<br />

between the time that a specified standard has been announced, and the time that it commences.<br />

Any attribution beyond that will, predictably, distort program design.” (BCOAPO Argument, p. 13)<br />

(emphasis in original)<br />

In its Reply, Terasen notes that “BCOAPO and BCSEA‐SCBC have made submissions on attribution of<br />

benefits. This issue is not relevant to the assessment of the proposed portfolio, as the assessment<br />

does not include any attribution of benefits. With respect to the assessment of future portfolios,<br />

the Terasen Utilities repeat and rely on the submissions made in paragraphs 109 to 111 of the<br />

Initial Submissions” (which argue for the inclusion of attribution savings.)<br />

(Terasen Reply, p. 20)<br />

Commission Determination<br />

The Commission Panel notes Terasen’s comment that the attribution issue is not relevant to this<br />

Application as the assessment does not include any attribution of benefits. However, as in the case<br />

of free riders, the Commission Panel does consider that this issue is likely to become a factor as the<br />

DSM initiatives of Terasen become more fully developed and refined, and therefore should be<br />

addressed in this Decision.<br />

The Commission Panel accepts the position of BC Hydro that attribution of savings from codes and<br />

standards should be evaluated on a case‐by‐case basis and that the attribution rate should reflect<br />

the level of support for market transformation. The Commission Panel shares the BCSEA‐SCBC’s