27.10.2013 Views

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

FORTISBC ENERGY INC. AND FORTISBC ENERGY (VANCOUVER ISLAND) INC.<br />

<strong>2010</strong> ENERGY EFFICIENCY AND CONSERVATION ANNUAL REPORT<br />

New<br />

Const<br />

Retrofit<br />

Table 4-16: Fireplace Timers Pilot Program Performance Forecast<br />

It is expected that the greater part of the target number of installations will be installed by the<br />

end of <strong>2011</strong>. As of January <strong>2011</strong> the Companies had an additional 247 potential timer<br />

installations recorded. The Companies require only that the participants accept the full terms<br />

and conditions and ensure a sufficient number of dwelling unit holders agree to participate in<br />

order to include these as participants.<br />

After a sufficient number of timers have been installed the Companies believe analysis work can<br />

begin and may generate meaningful results as to the savings per timer. If such results are<br />

reasonably consistent it may not be required to have all of the originally projected 1,000 timers<br />

installed as part of the pilot program. Analysis of the results could begin after the winter of <strong>2011</strong><br />

/ 2012, when a sufficient number of fireplace timers have been installed for a least one full<br />

heating season.<br />

4.4.2.6.4 Fireplace Timers Pilot Program Summary<br />

The aim of this program is to reduce the amount of natural gas used for decorative fireplaces<br />

and ultimately change the behaviour of the end user. By encouraging them to control the<br />

amount of time the fireplace is on, they are also becoming more aware of their energy use and<br />

ultimately their building’s energy use. The timers provide options for running times of 30<br />

minutes, 60 minutes, or 120 minutes before the fireplace turns off automatically. If by<br />

implementing this measure a building can save approximately three GJs per unit, that would<br />

add up to significant financial savings over several years.<br />

Market Retrofit<br />

Duration<br />

Utility Participants<br />

Incentive<br />

Expenditure<br />

($000s)<br />

4.4.2.7 Radiant Tube Heaters Pilot Program<br />

<strong>FEI</strong>: To be determined<br />

<strong>FEVI</strong>: To be determined<br />

Non-<br />

Incentive<br />

Expenditure<br />

($000s)<br />

Annual<br />

Energy<br />

Savings<br />

(GJ/yr)<br />

4.4.2.7.1 Program Overview<br />

Radiant Tube Heaters Pilot Program<br />

NPV<br />

Energy<br />

Savings<br />

(GJ)<br />

Free Rider<br />

Rate<br />

<strong>FEI</strong> - - - - 0%<br />

<strong>FEVI</strong> - - - - 0%<br />

<strong>FEI</strong> 400 20 1,200 4,901 0% 2.5<br />

<strong>FEVI</strong> 30 2 90 370 0% 2.0<br />

TOTALS<br />

430 22 193 1,290 5,271 0% 2.5<br />

SECTION 4: COMMERCIAL ENERGY EFFICIENCY PROGRAM AREA Page 80<br />

TRC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!