27.10.2013 Views

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

FEI-FEVI 2010 EEC Report filed March 31, 2011 - FortisBC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Innovative Technologies and Industrial<br />

• integrated “wireless control system” (eg. dorms, hotels) b/c difference in occupancy<br />

levels (Schneider electric)<br />

• heat recover add-ons to rooftop units (Lennox)<br />

• insulation tilt-up concrete buildings , BC (schools)<br />

• solar stack, “glass” space conditions (Manitoba Hydro)<br />

• building architecture<br />

• biomass with Innovative Technologies<br />

• education of technology operations for stakeholders<br />

• Canmet, collaboration studies<br />

• CGA technology<br />

Next Steps<br />

• meeting in <strong>March</strong> <strong>2011</strong><br />

• getting an industrial and innovative committee member for next <strong>EEC</strong> meeting

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!