03.10.2014 Views

minutes - City of Stirling

minutes - City of Stirling

minutes - City of Stirling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MINUTES OF THE ORDINARY MEETING OF COUNCIL<br />

18 SEPTEMBER 2012<br />

Committee Recommendation<br />

That the item relating to the Scarborough Beach Urban Design Revised Master Plan -<br />

Design Brief for Landscape Design Services for Separable Portion 2 be REFERRED to the<br />

Council meeting to be held 18 September 2012 to enable further consideration by<br />

Councillors.<br />

Officer's Recommendation<br />

That Council ENDORSE the attached Design Brief for the provision <strong>of</strong> Landscape Design<br />

Services to develop the Scarborough Beach Urban Design Master Plan – Separable<br />

Portion 2.<br />

Report Purpose<br />

To seek Council endorsement <strong>of</strong> the ‘Request for Quotation’ design brief for landscape<br />

detailed design services for Separable Portion 2 only to facilitate the implementation <strong>of</strong> the<br />

Scarborough Beach Urban Design Master Plan.<br />

Relevant Documents<br />

Attachments<br />

Attachment 1 – Design brief for the provision <strong>of</strong> landscape detailed design services for<br />

Separable Portion 2 only to facilitate the implementation <strong>of</strong> the Scarborough Beach Urban<br />

Design Master Plan<br />

Attachment 2 - Amended Design brief for the provision <strong>of</strong> landscape detailed design services<br />

for Separable Portion 2 only to facilitate the implementation <strong>of</strong> the Scarborough Beach<br />

Urban Design Master Plan<br />

Available for viewing at the meeting<br />

Nil.<br />

Background<br />

On the 3 April 2012 the Executive Team approved the design brief to procure landscape<br />

design services for the Scarborough Beach Urban Design Master Plan. Following this, a<br />

consultant was appointed from the <strong>City</strong>’s panel <strong>of</strong> consultants to prepare a finishing palette<br />

for Separable Portion (SP) 1, 2 & 3 and landscape detailed design documentation for<br />

Separable Portion (SP) 1 only. The value <strong>of</strong> this consultancy was $80,000. The design brief<br />

attached in Appendix 1 contains a plan indicating the areas referred to as separable<br />

portions. These are:<br />

Separable Portion (SP) 1 – Scarborough Beach Road/Entry plaza<br />

Separable Portion (SP) 2 – Southern Esplanade<br />

Separable Portion (SP) 3 – Northern Esplanade<br />

Separable Portion (SP) 4 – West Coast Highway<br />

165

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!