03.10.2014 Views

minutes - City of Stirling

minutes - City of Stirling

minutes - City of Stirling

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MINUTES OF THE ORDINARY MEETING OF COUNCIL<br />

18 SEPTEMBER 2012<br />

The <strong>City</strong>’s Engineering Design Business Unit is currently undertaking engineering detail<br />

design <strong>of</strong> the civil components for Separable Portion 1 as part <strong>of</strong> their work scope and are<br />

now in a position to commence engineering detail design <strong>of</strong> Separable Portion 2, the<br />

Southern Beach and Esplanade.<br />

On the 6 August 2012, the Executive Team approved the design brief to procure Landscape<br />

Design Services for Separable Portion 2 be submitted to Council for consideration. The<br />

<strong>City</strong>’s Purchasing and Tender Management Practice section 5.8.2 required that a design<br />

brief for consultancy services with an estimated value <strong>of</strong> over $100,000 must be approved by<br />

Council.<br />

Comment<br />

To progress detailed design <strong>of</strong> further stages and ensure consistency between the<br />

engineering and landscape design, it is recommended that the <strong>City</strong> seek quotations for a<br />

consultant to provide landscape detail design services for Separable Portion 2. Two<br />

consultants are available for selection from the <strong>City</strong>’s Infrastructure panel and as such no<br />

tender is required.<br />

The scope <strong>of</strong> works involves the preparation <strong>of</strong> full landscape detailed design, specification<br />

and tender documentation for Separable Portion (SP) 2. The design brief for the provision <strong>of</strong><br />

Landscape Design Services to develop the Scarborough Beach Urban Design Master Plan<br />

Separable Portion 2 is attached in Appendix 1.<br />

Consultation/Communication Implications<br />

Nil.<br />

Policy and Legislative Implications<br />

The consultancy services will be procured in accordance with the <strong>City</strong>’s Purchasing and<br />

Tender Policy and the Local Government Act 1995.<br />

Financial Implications<br />

Quotes will be sought from two (2) consultants from the <strong>City</strong>'s approved consultancy panel. It<br />

is estimated that cost for detailed design will be in the order <strong>of</strong> $150,000, based on previous<br />

quotation received for landscape detailed design services for Separable Portion 1.<br />

Funds have been budgeted for this purpose in Account H0028-3321.<br />

Strategic Implications<br />

Goal 2:<br />

Objective 2.1:<br />

SI 2.1.1:<br />

To plan, develop, enhance and maintain a quality built and natural<br />

environment based on sustainability principles.<br />

Position the <strong>City</strong> as a flagship <strong>of</strong> sustainable urban local government,<br />

encouraging innovative, creative and inspirational built form and<br />

infrastructure.<br />

Implement the Scarborough Environs Area Strategy (SEAS)<br />

166

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!