Travel in London Travel in London
travel-in-london-report-8
travel-in-london-report-8
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
4. Performance of the transport networks<br />
<strong>in</strong> the series. Performance <strong>in</strong> 2013/14 was very marg<strong>in</strong>ally lower, with 97.5 per cent<br />
of scheduled tra<strong>in</strong> kilometres operated.<br />
Underground reliability can also be expressed <strong>in</strong> terms of customer-focused<br />
measures such as average journey time and excess journey time (see table 4.3). The<br />
latter is the additional time that customers have to wait over and above that implied<br />
by the schedule as a result of unreliability <strong>in</strong> the service. Excess journey time has<br />
cont<strong>in</strong>ued to fall <strong>in</strong> 2014/15, from 5.2 m<strong>in</strong>utes <strong>in</strong> 2013/14 to a record low of 4.6<br />
m<strong>in</strong>utes <strong>in</strong> 2014/15.<br />
Table 4.3<br />
<strong>London</strong> Underground – service reliability and journey times.<br />
Year<br />
Tra<strong>in</strong><br />
kilometres<br />
scheduled<br />
(millions)<br />
Percentage<br />
of scheduled<br />
kilometres<br />
operated<br />
Average<br />
actual<br />
journey time<br />
(m<strong>in</strong>utes)<br />
Average<br />
generalised<br />
(weighted)<br />
journey time<br />
(m<strong>in</strong>utes)<br />
Excess<br />
journey time<br />
(weighted)<br />
(m<strong>in</strong>utes)<br />
Excess as %<br />
of<br />
generalised<br />
journey time<br />
2000/01 69.6 91.6 28.6 45.7 8.6 18.9<br />
2001/02 70.4 92.9 28.3 45.2 8.1 18.0<br />
2002/03 71.8 91.1 29.1 46.7 9.7 20.7<br />
2003/04 72.7 93.1 27.9 44.3 7.4 16.8<br />
2004/05 72.9 95.3 27.7 44.0 7.2 16.4<br />
2005/06 73.6 93.6 27.8 44.3 7.5 16.9<br />
2006/07 73.8 94.5 28.0 44.7 8.1 18.0<br />
2007/08 74.4 94.8 27.8 44.5 7.8 17.4<br />
2008/09 73.2 96.4 27.5 43.9 6.6 15.1<br />
2009/10 71.8 96.6 27.7 44.1 6.4 14.5<br />
2010/11 72.1 95.6 28.0 44.6 6.5 14.6<br />
2011/12 74.6 97.0 27.5 45.1 5.8 12.9<br />
2012/13 77.5 97.6 26.8 43.6 5.3 12.1<br />
2013/14 78.2 97.5 26.8 43.4 5.2 12.0<br />
2014/15 82.3 97.6 26.5 42.3 4.6 11.0<br />
Source: <strong>London</strong> Underground.<br />
1. Excess journey time is the difference between actual journey time and that expected if services run to time, and weighted to<br />
reflect how customers value time.<br />
4.7 Modal performance <strong>in</strong>dicators: Docklands Light Railway<br />
S<strong>in</strong>ce 2000/01 the Docklands Light Railway (DLR) has doubled the number of<br />
kilometres operated from 2.9 million to 5.8 million, as shown <strong>in</strong> table 4.4 –<br />
reflect<strong>in</strong>g both network expansion and enhanced service levels. The year 2014/15<br />
saw the percentage of scheduled services operated reach a record level of 99.3 per<br />
cent. To br<strong>in</strong>g the DLR <strong>in</strong> l<strong>in</strong>e with other TfL modes, <strong>in</strong> 2014/15 the ‘percentage of<br />
tra<strong>in</strong>s on time’ measure was replaced by a measure of Excess Wait<strong>in</strong>g Time (EWT),<br />
which has been back-cast to 2011/12 for comparison. 2014/15 saw an EWT figure<br />
of 0.07, which is the lowest of the series so far.<br />
79 <strong>Travel</strong> <strong>in</strong> <strong>London</strong>, Report 8