29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

General Instrisctions.—Continued. 1 2 3<br />

Engines or Freight Trains Coupled.—Continued.<br />

5.—All instances in which trains have been coupled during the night<br />

must be recorded by the signalmen in the occurrence books, and an extract<br />

sent to the Station Master for transmission to the District Superintendent.<br />

6.--A light engine may be attached in front of a train worked by one<br />

engine, and when it is already assisted by an engine in the rear, except where<br />

prohibited on pages 111-112. The load in this case should not exceed the<br />

maximum for the section.<br />

7.—Two light engines, or two engines and not more than two brake vans<br />

may be run coupled at any time, i.e., during the day or night, and on any<br />

line except where prohibited on pages 111 and 112, in any of the following<br />

positions :—<br />

1st.- 2 n d . 3 r d . 4 t h .<br />

Engine, Van, Engine, Van.<br />

Engine, Van, V a n , Engine.<br />

Engine, Engine, Van, V a n .<br />

Engine, Engine, Van, —<br />

Engine, Van. V a n ,<br />

Engine, Van, Engine,<br />

8.—A Freight train having empty coaching stock vehicles attached<br />

may couple to the rear of a goods or mineral train, but no train must be<br />

coupled to the rear of a freight train having coaching stock vehicles<br />

attached.<br />

9.—On purely mineral lines two trains may be coupled to another train,<br />

provided the total number of wagons does not exceed 110.<br />

rioteS.—See pages 120-122 for parts of the line where trains must not be<br />

toupied together.<br />

See below re Coupling of Vacuum fitted trains and loosely Coupled trains<br />

See page 212 re Coupling of trains between Pickering and Grosmont.<br />

See pages 202-3, re Coupling of trains through Shildon Tunnel.<br />

See pages 111-112 re sections of line where engines mustn ot be coupled<br />

together.<br />

See page 217 re coupling of six engines between Waterloo junction and<br />

Leeds East boxes.<br />

See page 215 re Coupling of three engines between Wistow Junction,<br />

Selby and Hagg Lane, Gascoigne Wood.<br />

See page 198 re Coupling of engines Hesleden and Kelloe Banks.<br />

See page 195 re Coupling of Mineral trains on Brandon Bank.<br />

(O. 6217).<br />

COUPLING OF VACUUM FITTED TRAINS AND LOOSELY<br />

COUPLED TRAINS.<br />

General Rule 149a.<br />

A train of wagons fitted with the Vacuum brake must not be coupled to<br />

any other train fitted with loose couplings. ( O . 3038).<br />

STOPPING OF TRAINS AT STATIONS WHERE THERE ARE<br />

LEVEL CROSSINGS.<br />

General Rule 152 (a).<br />

When stopping at stations where there are level crossings, drivers of<br />

passenger trains must see that the engine is brought to a stand clear of the<br />

crossing whenever this can be done without the train having to be drawn<br />

up twice. ( O . 5/1-1913).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!