29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Special Instructions applicable at Particular Places.—Continued. 209<br />

Working of Roseberry Mines Sidings, between Nunthorpe Junction<br />

and Great Aytaa--Continued.<br />

If, owing to the failure of the telephonic communication, the guard is<br />

unable to carry out these <strong>instructions</strong>, he must at once dispose of the<br />

train in the sidings and proceed cautiously with the engine to Great Ayton<br />

Station, taking with him the tablet, and advise the signalman verbally that<br />

the points are locked in the normal position. He must then hand the tablet<br />

to the signalman in order that tablet working may be carried on.<br />

If, however, the tablet is locked in the Intermediate Tablet Instrument,<br />

he must proceed on foot and advise the signalman of this, and at the same<br />

time inform him that the points are locked in the normal position.<br />

If it be known that telephonic communication has failed before the train<br />

leaves Nunthorpe Junction or Great Ayton Station, as the case may be, the<br />

train must be detained until there is sufficient margin to make the journey<br />

through the section, or to the Mines and back, without restoring tablet<br />

communication. ( O . 4407).<br />

NORTHALLERTON.—SHUNTING OF TRAINS ON TO THE<br />

DOWN LEEDS LINE AT LOW JUNCTION.<br />

When it is necessary to set a train back to the Down Leeds line at thisplace,<br />

the Guard must precede the train and protect the Springwell Lane<br />

Level Crossing.<br />

Passenger trains must not be shunted at Low Junction. ( O . 1630),<br />

WORKING AT HARMBY QUARRY SIDING BETWEEN<br />

LEYBURN AND SPENNITHORNE.<br />

(I) This Quarry is situated about 600 yards east of Leyburn East Box,<br />

and is controlled by two ground frames, which are interlocked with the<br />

electric tablet. The sidings point at the east end are facing to Down trains,<br />

and those at the west end are facing to Up trains.<br />

(2). The Quarry may be worked by trains as under :—<br />

East End Connection.<br />

By trains travelling in the Up direction only.<br />

West End Connection.<br />

By trains travelling in either direction.<br />

The working must be as follows :—<br />

Up Direction (West Ground Frame).<br />

(3) Wagons for the Quarry must be placed next the engine at Leyburn.<br />

On arrival at the siding, the Guard must properly secure his train, obtain<br />

the Tablet from the Driver, and set the points for the siding before uncoupling.<br />

(4) Traffic for the siding must be placed in the right hand line of the<br />

loop, the engine must be uncoupled and run forward clear of the loop<br />

points, and then return to train by left hand loop, pushing out any traffic<br />

that has to be removed from that siding.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!