29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

294 S i n g l e Lines.—Continued.<br />

Between Sherburn Colliery Junction and Broomside.—Cohtinued.<br />

(b) In the event of a train requiring to enter the single line at Sherburn<br />

Colliery Junction box while shunting operations are being carried on<br />

under the circumstances referred to in Clause (a), the train may be<br />

accepted by the signalman at Broomside after the engine performing<br />

the shunting operations in the Broomside Sidings has been brought<br />

within the protection of the Down Home signal worked from Broomside.<br />

A train entering the single line at Sherburn Colliery Junction under<br />

such circumstances must be brought to a stand and the driver verbally<br />

warned that the line is only clear to the Home signal. (O. 2304).<br />

PESSPOOL JUNCTION AND SOUTH HETTON COLLIERY.<br />

On Saturdays, after the closing signal has been given from South Hetton Colliery,<br />

and acknowledged from Pesspool Junction, a train may be allowed to enter the<br />

branch at Pesspool Junction to proceed to the Colliery and back, the trainmen<br />

being informed of the circumstances, and no other train must be allowed on the<br />

Branch until it has returned. No engine of the Colliery Company must enter<br />

the section without the proper signals having first been exchanged. (O. 6549).<br />

HARTLEPOOL STATION AND HARBOUR STREET CROSSING.<br />

When a train is allowed to enter the single line at either end in accordance<br />

with these regulations, it may use the Old Fish Quay Sidings, and, during the<br />

time these sidings are being made use of, no other train must be allowed to<br />

enter upon the single line (except as stated in Regulation 2, page 293) until the<br />

signalman towards whose box the train was proceeding has received an assurance<br />

from the guard or shunter working with the train that the single line has<br />

been cleared ; the guard or shunter must give this information.<br />

The signalman receiving this intimation may then give the TRAIN OUT OF<br />

SECTION signal to the rear box, and another train may be allowed to pass over<br />

the single line.<br />

At which ever end such train enters the single line the signalman concerned<br />

must advise the driver that a train is already at the Old Fish Quay SA ogs<br />

and warn him to proceed cautiously, so that in the event of the single line being<br />

fouled from any cause he may be able to bring his train promptly to a stand.<br />

Before resuming any shunting operations which will in any way foul the single<br />

line, the guard or shunter must obtain the permission of the signalmen at both<br />

ends of the single line, without which the single line must not be fouled.<br />

When the train is ready to leave the Old Fish Quay Sidings for Harbour Street<br />

Crossing Box, the guard or shunter must advise the signalman at Hartlepool<br />

Station Box. If the train is proceeding to Hartlepool Station Box, the guard<br />

or shunter must advise the signalman at Harbour Street Crossing Box, and when<br />

the line is clear and these regulations have been complied with, the signalman<br />

will give the necessary permission, without which the single line must not be<br />

fouled. ( 0 . 2555)<br />

1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!