general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4<br />
I<br />
:<br />
T<br />
h<br />
.<br />
e<br />
p<br />
l<br />
a<br />
o<br />
s<br />
o<br />
s<br />
p<br />
e<br />
l<br />
n<br />
i<br />
g<br />
n<br />
e<br />
e<br />
r<br />
m<br />
t<br />
u<br />
r<br />
s<br />
a<br />
t<br />
i<br />
-<br />
n<br />
t<br />
o<br />
i<br />
h<br />
t<br />
s<br />
e<br />
b<br />
e<br />
y<br />
e<br />
n<br />
f<br />
*<br />
t<br />
u<br />
u<br />
e<br />
l<br />
s<br />
r<br />
l<br />
e<br />
i<br />
y<br />
d<br />
n<br />
u<br />
f<br />
g<br />
n<br />
-<br />
o<br />
t<br />
d<br />
M<br />
r<br />
h<br />
e<br />
i<br />
t<br />
e<br />
r<br />
n<br />
r<br />
U<br />
s<br />
e<br />
a<br />
p<br />
t<br />
s<br />
i<br />
I<br />
a<br />
g<br />
n<br />
r<br />
s<br />
d<br />
o<br />
c<br />
e<br />
w<br />
u<br />
o<br />
p<br />
h<br />
n<br />
n<br />
e<br />
a<br />
d<br />
v<br />
n<br />
t<br />
f<br />
e<br />
d<br />
i<br />
r<br />
y<br />
e<br />
s<br />
a<br />
i<br />
n<br />
b<br />
m<br />
n<br />
t<br />
e<br />
g<br />
f<br />
i<br />
f<br />
p<br />
r<br />
n<br />
o<br />
a<br />
o<br />
g<br />
r<br />
u<br />
Special Instructions applicable at Partici;lar Places.—Continued. :207<br />
SALTBURN,—LOOP LINE, JUNCTION SIGNAL BOX.<br />
The loop line must not be used as a siding, and no vehicles must be left<br />
,standing on it.<br />
No train or engine must be allowed to stand on the loop line whilst a<br />
HUTTON GATE—WORKING AT BELMONT MINES SIDING.<br />
(0.135. 533).<br />
The North Eastern Railway Company's engine must not be attached to<br />
a train of laden traffic standing in the siding without the Guard informing the<br />
Belmont Mines Traffic Chargeman that he is going to do so, and ascertaining<br />
from the latter that it is in order. The Driver must not attach his locomotive<br />
to the trucks unless he is ready to take the train out forthwith.<br />
The engine having been attached after such permission has been given,<br />
the Belmont Mines Traffic Chargeman must not gravitate a set of laden traffic<br />
into the laden sidings without informing the Guard that he is going to do so.<br />
The Guard having been informed that a portion of the set is to be gravitated<br />
into the laden sidings, must inform the Fireman and Driver, and see that<br />
any work they may be doing on the engine.<br />
There is a chock placed clear of the fouling point of the outgoin„: • of the<br />
laden sidings. Drivers, if they have any work to do on their engine before<br />
leaving with an outward load, must do so beforo this chock is moved and<br />
their engine is attached to the laden traffic. ( O . 50/11/12).<br />
WORKING OF ROSEBERRY MINES SIDING, BETWEEN<br />
NUNTHORPE jUNCTiON AND GREAT AYTON.<br />
An Intermediate Tablet Instrument has been provided at the Roseberry<br />
The Roseberry Mines Sidings, and so clear the running line for the passing<br />
of other trains. The signalman at the box from which the train starts will<br />
instruct the guard as to whether the train has to lock in as soon as it<br />
reaches the siding. Guards to be on the look out when passing the signalbox.<br />
On arrival at Roseberry Mines the fireman will obtain the tablet with<br />
key attached from the driver, and insert the tablet in the lock of the lever<br />
'frame. He must then set the points to allow the train to enter the sidings.<br />
If tablet working has to be restored, after the whole of the train has been<br />
placed in the siding, the guard must make the train secure and afterwards<br />
proceed to the frame and, restore the points to their normal position, withdraw<br />
the tablet and work the intermediate tablet instrument as follows :—<br />
(1) Put tablet into slide of instrument and pull the handle from No. 1<br />
to No. 2 position.<br />
(2) Telephone the signalmen at Nunthorpe Junction and Great Ayton<br />
and inform them that the whole of the train is locked in the<br />
siding clear of the running line, and that the tablet has been<br />
inserted in the instrument and handle pulled to No. 2 position.