29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Special Instructions applicable at Particular Places.—Continued. 2 0 1<br />

WORKING OF TRAFFIC INTO AND OUT OF SIDINGS AT<br />

SCOTCH ISLE, BETWEEN HARPERLEY AND WOLSINGHAK<br />

Owing to the heavy gradient, traffic must only be worked to and from<br />

this Siding by trains travelling in the Up direction, i.e., with the engine at<br />

the lower end. ( 0 . 1 3 . T . 671).<br />

WORKING OF TRAFFIC INTO AND OUT OF THE SIDINGS AT<br />

CAMBOKEELS, BETWEEN EASTGATE AND WESTGATE,<br />

WEAR VALLEY BRANCH.<br />

Owing to the gradient <strong>Of</strong> the line, trains working traffic into and out of<br />

these sidings must always have the engine at the lower (or Eastgate) end.<br />

In consequence wagons should not be detached into these sidings from trains<br />

passing in the down direction. The sidings must only be worked by trains<br />

terminating there or those passing in the up direction. (0.13.T. 647).<br />

BOWDEN CLOSE COLLIERY SIDINGS, WILLINGTON.<br />

Engines must not pass through any of these Sidings to Bank Foot for<br />

any purpose until the Guard has obtained authority from the signalman<br />

at Bowden Close Colliery Junction Box, who must first get permission from<br />

the Pointsman at Bank Foot Box. The Pointsman must only give this<br />

permission provided the safety points are set against an engine approaching<br />

from the colliery and there is no engine shunting at the Bank Foot which<br />

can foul the engine coming from Bowden Close signal box.<br />

When the Bank Foot Box is closed, the signalman at Bowden Close Colliery<br />

Junction may authorise the running of the engine to Bank Foot.<br />

(O. 7569).<br />

SHILDON TUNNEL.<br />

Gradient 1 in 242 falling towards Bishop Auckland.<br />

No engine or train of any description must be allowed to enter the tunnel<br />

at either end when it is occupied by a Passenger train, Engineer's Ballast<br />

or Work train stopping and working in the Tunnel, or a train conveying<br />

a snow plough.<br />

No Engine or Train (passenger train excepted) must be permitted to enter<br />

the Tunnel at either end after a Passenger Train has been signalled as<br />

leaving Bishop Auckland or Simpasture Junction respectively.<br />

NORTH END OF TUNNEL.<br />

I.—After a Down Passenger train has been accepted by the Signalman<br />

at Tunnel North Box the Is line clear signal for an Up train must not be<br />

offered to Tunnel South, nor must the Is line clear signal for an Up Passenger<br />

train be offered to Tunnel South box if a Down Freight train has been<br />

accepted, until the Down train in either case has passed Tunnel North box<br />

with tail lamp attached.<br />

2.—The signalman at Tunnel North must not accept an Is line clear signal<br />

from Tunnel South for a passenger train until the signal has been forwarded<br />

to and accepted by the Signalman at Black Boy Junction.<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!