29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

198 Special Instructions applicable at Particular Places.—Continued.<br />

SUNDERLAND.—WORKING OF CALLING-ON SIGNALS IN THE<br />

TUNNEL AT SUNDERLAND NORTH.<br />

When these Calling-on Signals, which are under the Up Main and Duplicate<br />

Home Signals, are in the " <strong>Of</strong>f" position, a purple light is shewn.• When<br />

they are in the " Danger " position, a red light is shewn.<br />

(O. 18/262/21).<br />

SUNUERLAN.11—FASENGER TRAINS ASSFITE0 FROM SOUTH BOX<br />

TO FAWCETT STTILET Lasvmou hOX BY AN ENGINE<br />

IN THE REAR.<br />

Loaded passenger trains assisted by an engine in the rear must not be<br />

allowed to start out of Sunderland Station until it has been ascertained that<br />

the line is clear as far as -<br />

signal 1'vlillfield has been lowered. This information the signalman at Fawcett Street<br />

SJunction t a tBox i omust n supply by telephone when informed by the signalman<br />

at Sunderland South Box that a train to be So assisted is ready to start, and<br />

a n d<br />

the signalman at Fawcett Street junction box must not lower his signals for<br />

a t train hso assisted e until after the Burnfield Box signals have been lowered.<br />

F a w c e<br />

t<br />

A slip<br />

t<br />

coupling is kept at Sunderland to be used 'in connection with the<br />

above arrangement.<br />

S t r e<br />

e t<br />

RVHOPE. PAOSENGER TRAINS DOWN SEATON BANK.<br />

"<br />

D All Down i Passenger s trains must come to a stand at Ryhope Station<br />

tPlatform. a n<br />

t<br />

• DIAMOND HALL MitgOTION (FAILLFIELD) AND SOUTHWICK JUNCTION<br />

(USINCRTH), VIA QUEEN ALEXANDRA BRIDGE.<br />

Double-headed trains must not be run over this section of the line.<br />

(G. 31568).<br />

COUPLING OF ENGINES—liESLEDEN AND KELLOE BANKS.<br />

On Hesleden and Kelloe Banks, an engine or an engine and van may be<br />

coupled to, and run in rear of a Freight train, or of two coupled Freight<br />

trains, when ascending the Bank. ( O . 7416.)<br />

WORKING C<br />

HIGH , QUARRIES BETWEEN COXHOE BRIDGE AND TRIMDOlt<br />

Owing F to the heavy gradient, traffic into and out of these quarries must<br />

only be T Rattached A F and detached by trains running from the Ferryhill<br />

direction<br />

F I C<br />

If the load consists of more than 35 wagons, it must be divided on the<br />

main line, I Nand<br />

not more than 35 wagons must be put into the quarry sidings<br />

at one Ttime, O the portion left standing on the main line must always have<br />

the assistant A engine as well as the brake van in the rear.<br />

A sufficient N number of brakes must be pinned down to hold the wagons<br />

when they are pushed into the quarry sidings, and the engine brake must<br />

be kept D for cases of emergency. ( O . 7037).<br />

O<br />

U<br />

T<br />

O

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!