29.03.2013 Views

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

general instructions. - Limit Of Shunt

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Single Li nes.—Continued. 2 7 7<br />

HEXHAM AND ALLENDALE BRANCH.<br />

The siding points at Glendue Siding, Elrington, Langley, Staward and<br />

Allendale Stations are worked from a ground frame. The levers can only<br />

be worked by inserting the staff in the receptacle provided in accordance<br />

with the <strong>instructions</strong> exhibited at each ground frame.<br />

If an engine should become derailed or disabled while the staff is in the<br />

frame, the ,point levers must be restored to their normal pgsition (being disconnected<br />

if necessary) in order to relieve the staff and admit of Regulation<br />

8 of the Regulations for working single lines of railway by only one engine<br />

in steam being carried out.<br />

WATERHOUSES.—FLASS JUNCTION.<br />

Up Passenger trains proceeding from Mass Junction to Waterhouses<br />

Station, and also engines and vans proceeding from Mass Junction to<br />

Waterhouses Colliery to pick up a load may, when necessary, return to Mass<br />

Junction without passing through the section to exchange the Tablet at<br />

Waterhouses Goods Crossing Box. ( O . 234 4. )<br />

• CORONATION SIDING BETWEEN WEARHEAD AND WESTGATE.<br />

Freight trains proceeding from Wearhead to Coronation Siding between<br />

Wearhead and Westgate may, when necessary, return to Wearhead without<br />

passing through the section to exchange the tablet at Westgate. When a<br />

Freight train has to return to Wearhead, arrangements must first be made<br />

with the Signalman there, and no shunting outside the Home Signal must<br />

be allowed until the Freight train has passed out of the section. (O. 7639.)<br />

CAMBOKIELS SIDING AND GREENFOOT QUARRY SIDING<br />

BETWEEN STANHOPE JUNCTION AND WESTGATE.<br />

Freight trains proceeding from Stanhope Junction to Greenfoot Quarry<br />

or Cambokiels Siding between Stanhope and Westgate may, when necessary,<br />

return to Stanhope Junction without passing through the section to exchange<br />

the tablet at Westgate. When a Freight train has to return to Stanhope<br />

Junction, arrangements must first be made with the Signalman there, and<br />

no shunting outside the Home Signal must be allowed until the Freight<br />

train has passed out of the section. ( O . 7639.)<br />

MARSHALL GREEN SIDING AND WITTON-LE-WEAR STATION<br />

SIDING BETWEEN WITTON WEST AND HARPERLEY•<br />

Freight trains proceeding from Witton West to Marshall Green Siding<br />

oliWitton-le-Wear Station between Witton West and Harperley, may, when<br />

necessary, return to Witton West without passing through the section to<br />

exchange the tablet at Harperley. When a Freight train has to return to<br />

Witton West, arrangements must first be made with the Signalman there,<br />

and no shunting outside the Home Signal must be allowed until the Freight<br />

train has passed out of the section. ( O . 7639.)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!