general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Single Li nes.—Continued. 2 7 7<br />
HEXHAM AND ALLENDALE BRANCH.<br />
The siding points at Glendue Siding, Elrington, Langley, Staward and<br />
Allendale Stations are worked from a ground frame. The levers can only<br />
be worked by inserting the staff in the receptacle provided in accordance<br />
with the <strong>instructions</strong> exhibited at each ground frame.<br />
If an engine should become derailed or disabled while the staff is in the<br />
frame, the ,point levers must be restored to their normal pgsition (being disconnected<br />
if necessary) in order to relieve the staff and admit of Regulation<br />
8 of the Regulations for working single lines of railway by only one engine<br />
in steam being carried out.<br />
WATERHOUSES.—FLASS JUNCTION.<br />
Up Passenger trains proceeding from Mass Junction to Waterhouses<br />
Station, and also engines and vans proceeding from Mass Junction to<br />
Waterhouses Colliery to pick up a load may, when necessary, return to Mass<br />
Junction without passing through the section to exchange the Tablet at<br />
Waterhouses Goods Crossing Box. ( O . 234 4. )<br />
• CORONATION SIDING BETWEEN WEARHEAD AND WESTGATE.<br />
Freight trains proceeding from Wearhead to Coronation Siding between<br />
Wearhead and Westgate may, when necessary, return to Wearhead without<br />
passing through the section to exchange the tablet at Westgate. When a<br />
Freight train has to return to Wearhead, arrangements must first be made<br />
with the Signalman there, and no shunting outside the Home Signal must<br />
be allowed until the Freight train has passed out of the section. (O. 7639.)<br />
CAMBOKIELS SIDING AND GREENFOOT QUARRY SIDING<br />
BETWEEN STANHOPE JUNCTION AND WESTGATE.<br />
Freight trains proceeding from Stanhope Junction to Greenfoot Quarry<br />
or Cambokiels Siding between Stanhope and Westgate may, when necessary,<br />
return to Stanhope Junction without passing through the section to exchange<br />
the tablet at Westgate. When a Freight train has to return to Stanhope<br />
Junction, arrangements must first be made with the Signalman there, and<br />
no shunting outside the Home Signal must be allowed until the Freight<br />
train has passed out of the section. ( O . 7639.)<br />
MARSHALL GREEN SIDING AND WITTON-LE-WEAR STATION<br />
SIDING BETWEEN WITTON WEST AND HARPERLEY•<br />
Freight trains proceeding from Witton West to Marshall Green Siding<br />
oliWitton-le-Wear Station between Witton West and Harperley, may, when<br />
necessary, return to Witton West without passing through the section to<br />
exchange the tablet at Harperley. When a Freight train has to return to<br />
Witton West, arrangements must first be made with the Signalman there,<br />
and no shunting outside the Home Signal must be allowed until the Freight<br />
train has passed out of the section. ( O . 7639.)