general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
general instructions. - Limit Of Shunt
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
82 G e n e r a ! instractions.---Continued.<br />
Working of N.E. and Foreign Co.'s Mail Vans over N.E. Line.--Continued.<br />
Leeds and Hull (In the event of the Main line being blocked, the vans<br />
may work by any alternative route between these points).<br />
(4) N.E. OR FOREIGN MAIL VANS ON EAST COAST TRAINS<br />
DIVERTED VIA CARLISLE.<br />
Newcastle and Carlisle, under conditions set out in pamphlet, dated 4th July,<br />
1921, entitled " Lines blocked between Edinburgh and Newcastle. Instructions<br />
in regard to diversion of East Coast Trains." ( B . 2130).<br />
(5) ON THE FOLLOWING SECTIONS OF LINE MAIL VANS OF THE TYPES<br />
AUTHORISED TO WORK OVER SUCH SECTIONS MAY BE RUN WITH<br />
THE NETS AND TRADUOTORS AT EITHER SIDE :-<br />
All routes from the South into York (subject to restriction in paragraph 6).<br />
Between Newcastle and Low Fell, via King Edward Bridge or High Level<br />
Bridge<br />
Between NewcasUe and Pelaw.<br />
etween Hull and Leeds.<br />
•tik•Ctill Hug and Brngton.<br />
Alternative Routes to Main Line authorised for L. & Y. wide stock, for GMvans<br />
orfly (traductors on both sides).<br />
On all other sections of line over which they are authorised to travel, mail<br />
vans must always be run with the nets and traductors on the side opposite<br />
to the six-foot way.<br />
.(<br />
6<br />
)<br />
(<br />
7<br />
)<br />
(<br />
8(9)<br />
)<br />
When Mail Vans fitted with nets and traductors on the six-foot side<br />
are run on trains through Brotherton Tunnel, Burton Salmon, the<br />
following arrangements must be carried out :—<br />
Up trains must stop at Brotherton Quarry (or Burton Salmon Junction<br />
Box if Brotherton Quarry is closed), and Down trains at Ferrybridge,<br />
when the Guard must inform the Signalman of the identity of the train<br />
so that arrangements may be made for Up and Down trains conveyina<br />
Mail Vans not to pass through the Tunnel at the same time. If the<br />
Up train is allowed through the tunnel first, the Down train must not<br />
be allowed to leave Ferrybridge until the Up train has passed Ferrybridge.<br />
If the Down train is allowed through the Tunnel first, the Up<br />
train must not be allowed to leave Brotherton Quarry or Burton Salmon<br />
Junction Box until the Down train has passed Brotherton Quarry or<br />
Burton Salmon Junction Box.<br />
Bogie Mail Vans must not travel on the two inner Goods lines behind<br />
Newcastle Central Station, but must be worked either on the North<br />
or South Wall Goods lines.<br />
Mail Vans must not be conveyed on Goods trains.<br />
These <strong>instructions</strong> cancel all previous <strong>instructions</strong> in regard to the<br />
sections of line over which mail vans are permitted to work.<br />
(B. 1314.11).