19.01.2014 Views

Introduction to the Agilent 7100 Capillary Electrophoresis System

Introduction to the Agilent 7100 Capillary Electrophoresis System

Introduction to the Agilent 7100 Capillary Electrophoresis System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8 Maintenance<br />

Cleaning <strong>the</strong> Electrodes, Pre-punchers and Insulation Plate<br />

Cleaning <strong>the</strong> Electrodes, Pre-punchers and Insulation Plate<br />

Buffer precipitates, dust, moisture or o<strong>the</strong>r solid material in <strong>the</strong> electrodes<br />

and pre-punchers or under <strong>the</strong> insulation plate may cause arcing. They can<br />

lead <strong>to</strong> current leakage, buffer contamination or carry-over. Cleaning <strong>the</strong>se<br />

parts regularly will prevent this.<br />

The electrodes, pre-punchers and <strong>the</strong> insulation plate should be cleaned<br />

regularly. Depending on <strong>the</strong> application, cleaning frequency can be for<br />

example once a week, or if peaks show unusual tailing or unusual peak<br />

shoulders. Please be aware that <strong>the</strong> EMF counter analysis start lets you set<br />

cus<strong>to</strong>mized limits for warnings. Cleaning is necessary if arcing or excessive<br />

current leakage is observed. Usage of creeping buffers, such as urea, may lead<br />

<strong>to</strong> higher cleaning frequency.<br />

Steps for <strong>the</strong> cleaning procedure for electrodes, pre-punchers and <strong>the</strong><br />

insulation plate:<br />

• Prepare <strong>the</strong> <strong>Agilent</strong> CE instrument for this task<br />

• Remove <strong>the</strong> covers<br />

• Access <strong>the</strong> electrodes<br />

• Access <strong>the</strong> liquid handling module<br />

• Access <strong>the</strong> pre-punchers<br />

• Clean <strong>the</strong> electrodes<br />

• Clean <strong>the</strong> pre-punchers<br />

• Clean <strong>the</strong> insulation plate<br />

• Reinstall <strong>the</strong> pre-punchers<br />

• Reinstall <strong>the</strong> insulation plate<br />

• Reinstall <strong>the</strong> electrodes<br />

NOTE<br />

Follow <strong>the</strong> common safety regulations for labora<strong>to</strong>ries when doing this task. Wear safety<br />

glasses and rubber gloves.<br />

196 <strong>Agilent</strong> <strong>7100</strong> <strong>Capillary</strong> <strong>Electrophoresis</strong> <strong>System</strong> User Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!