19.01.2014 Views

Introduction to the Agilent 7100 Capillary Electrophoresis System

Introduction to the Agilent 7100 Capillary Electrophoresis System

Introduction to the Agilent 7100 Capillary Electrophoresis System

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8 Maintenance<br />

Cleaning <strong>the</strong> Electrodes, Pre-punchers and Insulation Plate<br />

9 Push <strong>the</strong> liquid handling module back in<strong>to</strong> <strong>the</strong> instrument as shown in<br />

Figure 70 on page 213. To release it from <strong>the</strong> front position, slightly more<br />

force is needed. Carefully move <strong>the</strong> liquid handling module completely in<strong>to</strong><br />

a position that allows fixation. Please note <strong>the</strong> metal nose from <strong>the</strong> liquid<br />

handling module which has <strong>to</strong> fit in a hoe of <strong>the</strong> back metal sheet as shown<br />

in Figure 69 on page 212.<br />

Metal pin<br />

Connec<strong>to</strong>rs for<br />

water,<br />

pressure,<br />

drainage<br />

Figure 69<br />

Rear side of liquid handling module<br />

NOTE<br />

Take care not <strong>to</strong> damage tubes and flat ribbon cables on <strong>the</strong> right-hand side of <strong>the</strong> liquid<br />

handling module.<br />

Take care that <strong>the</strong> connec<strong>to</strong>rs on <strong>the</strong> left-hand side, for example for <strong>the</strong> drainage, fit in<strong>to</strong><br />

<strong>the</strong>ir cut-out in <strong>the</strong> back.<br />

212 <strong>Agilent</strong> <strong>7100</strong> <strong>Capillary</strong> <strong>Electrophoresis</strong> <strong>System</strong> User Manual

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!