I Box. 4.9 Icroaigenviironmental. concerns early in planning: some recent lessonts<br />

'from SriLnk<br />

Over the -past decade, developing. countries,.and the researthes and environmnental experts, the study deter.<br />

-World Bank itseZ, have begun to require comprehenisive mined long-term development options for the 5ector,<br />

envirnmental assessments (MAs) ~as. a routine compo-.. incorprating. envirnmental concerns. Alternative<br />

nent of .prmject development. This reuirement has. strategies were compared, taking into account system<br />

foncd a bteinertoofevomntal dcerns cost, biodJiversity, health-effects, .system-reliability, and,<br />

into poetdesignk, with appropriate attention to mitiga- greenhouse. gas emissions. The technique of multition<br />

options. But-a project4evel EA is best at dealing: attribute -decision atnalYsis, whichleritsaayi of<br />

with proj1ect-level mitigationjissues Without considera-: tradeoffs between -objectives~, is-particularly. useful in<br />

dion of environmental issues at- the long-term planning such assessments when economic valuationi of environstage,<br />

itis doubtful that project-level. EAs can steer the; mnental externalities proves difficult<br />

deveopmnt f a ectr aongenvioronmentally sustain- Fyom, the analysis, the study identified the set of<br />

able paths,Freaml,beas<br />

pactsof hdropantsare<br />

the environmental im-<br />

-quite diffeent from those of -<br />

"nndominated" options that was better than the others<br />

in at least oeattribute (such as cost, emissions reliabil-<br />

* Themal gn&rnin. th quetioni of ho~w air pollution ity) but no wojrse int the other attributest This set repreimpacts<br />

are tradedcf ih nnaio-eae impacts sents thi. options that decsionmakers need to consider<br />

-fall well outside the domain of project EAs. Although and induded, for example, notonly alternative fuel corn-<br />

-_the.incremental effect of a single plant-can be rational-.<br />

fred uiteeasil, wht ma ter ste oerl impact of<br />

binations in power plants but also supply-side efficiency<br />

improvements int the transmission -and distribution systhe<br />

sequence bfd plants ini a power sector investment' tern and demand-sde management options, such as the<br />

program.<br />

~~~~~~~~~~~iniroduction-of<br />

compact fluorescent lighting.<br />

A recent World Bank study of thie Sri Lankan po-wer. Following this,study, such new methods of evaluasector<br />

examnehd ways of bringing consideration of envi- tion have begun-to be institutionalized in the Sri Lankan<br />

wonmental issues into the early stages of poe etri- utilitys planning cycle. In 1993, for the first time, the*<br />

vestmentplanning and of dealing with the basic issues of study for planning expansion of generating capacity incompaning<br />

very different kinds of.environnmental ho- duded aVsstematic eamination ofdemand-side-manpacts<br />

associated wihdfeet technlogies. Working agement and privatization options, as well as an envi-<br />

7with the Sri Larnkan generationt utility and a group of .ronmental overview of conventional supply options.<br />

ment of thte econom3ic and fmandial-risics is often pacts are identified antd assessed. Experience with<br />

criticaL Because of the inherentt uncertainity in fore- evrn ntlassessments demonstrates that infracas-ts<br />

of future conditions,: projects should be se- structure projects are least likely to impose stress on<br />

lected on the basis of careful sensitivity analysis. the environument if such assessments occur early<br />

Planning forecasts -in the World Bank's appraisal of; and influence the design of individual projects-not<br />

infrstrutureprojects have sometimes overesti- just the selection of a particular project from a set of<br />

mated dem-and (Chapter 1). High demand forecasts alternatives. In Sri Lanka a recent power planning<br />

lead to larger facilities, resulting in the selection of study involved not only selecting from among vanmore<br />

capital-intensive investment options. Tech-. ous fossil fuel and other generating options, but also<br />

niques that facilitate risk analysis in complex infra- paying attention to the need for energy conservastructur<br />

projects, such as applying multicriteria tion (Box 4.9).<br />

methods or drawing on financial options theory, are As the scale of hinfastructur projects grows,<br />

currnty. being developed,<br />

environmental consequences become increasingly<br />

E,wiromnental<br />

~~~~~ ,~~.significant<br />

A study of several large World Bankfunded<br />

projects in Brazi (representin total ap-<br />

ASSESSING ENVIONMENTA IMPACt. Envirorkment- proved Bank financing of $1.15 billion) examined<br />

tal regulation and promotion of the efficient use of environmental consequences and emphasized that<br />

ifatructure help reduce adverse consequences environmental assessments should take a. broad<br />

from existing infrastructur, issues ththv en perspective capable of recognizing regional effects<br />

explored in detail by World Development Report 1992. and induced economic impacts, as well as the po-<br />

More options'are* available with new projects, al- tential consequences of broad economic conditi-ons<br />

though investment decisions can be consistent with. for the project Moreover, even though large investenvironmental<br />

objectives only if environmnental im- ment programs mybe broken down into subcom-.<br />

87