11.07.2015 Views

Encore Two User Manual - AMS Neve

Encore Two User Manual - AMS Neve

Encore Two User Manual - AMS Neve

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Encore</strong> <strong>Two</strong> <strong>User</strong> <strong>Manual</strong> Issue 1To set Meter Designer Defaults> Click on the Defaults tab.The Defaults page allows the default metering type to be set for all pathtypes and meter groups.It also allows the default metering pick off point to be selected for eachpath type and the default following mode for stem metering groups.The Meter Designer Defaults are stored according to the current <strong>Encore</strong>user so that each user can have their own metering preferences.To set metering defaults for a path type> Click on the radio button for the required path type.> Click on the drop down arrow next to the Meter Type box.The Meter Type list will appear.> Click on the required meter type.> Click on the drop down arrow next to the Meter box.The Meter pick off point list will appear.> Click on the required pick off point.To set metering defaults for Stems> Click on the drop down arrow next to the Meter Type box.The Meter Type list will appear.> Click on the required meter type.> Click on the drop down arrow next to the Follow box.The options are:• PEC and PEC2 to follow the Stem selection keys A to F on the first orsecond PEC/Direct Panel in the partition;• Surround to follow the selections on the Meter section of theSurround Monitoring Panel, and• Fixed to always monitor a selected stem or the film outputs.> Click on the required Follow option.> Click the drop down arrow for Stem Width.The options are 2, 4, 6, 7 or 8, corresponding to the number of Filmpaths that can be selected in Desk Edit.> Click the required number of meters.To set the default meter type for Wild Meters and PreDubs.> Click on the drop down arrow next to the respective Meter Type box.The Meter Type list will appear.> Click on the required meter type.- 189 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!