3-119 | EPC Templateor acts generally accepted in such industry having due regard for, among other things, themanufacturer’s maintenance requirements, the requirements of Governmental Authoritiesand any applicable agreements.“Governmental Authority” shall mean the national government, and any regulatorydepartment, body, political subdivision, commission, agency, instrumentality, ministry,court, judicial or administrative body, taxing authority, or other authority thereof(including any corporation or other entity owned or controlled by any of the foregoing)having jurisdiction over either Party, the Facility or the Site, whether acting under actualor assumed authority. Permits, orders or other approvals given by such bodies are“Governmental Authorizations”.“Guaranteed Mechanical Completion Date” described in Section 11.4 shall mean -__[Insert Date]_____, as such date may be extended by any Force Majeure condition,but not later than ___[Insert Date]________.“Guaranteed Maximum Price” shall have the meaning assigned to it in Section 7.2.“Hazardous Substances” shall mean, collectively, any petroleum or petroleum product,asbestos in any form that is or could become friable, transformers or other equipment thatcontain dielectric fluid containing levels of polychlorinated biphenyls (PCBs), hazardouswaste, hazardous material, hazardous substance, toxic substance, contaminant orpollutant, as defined or regulated under any federal, state or local law relating to theprotection of the environment, including the Resource Conservation and Recovery Act,as amended, 42 U.S.C. § 6901 et seq., the Comprehensive Environmental ResponseCompensation and Liability Act, as amended, 42 U.S.C. § 9601 et seq., or any similarstate statute.“Independent Engineer” shall mean a qualified independent engineering firm mutuallyagreeable to Contractor and the State, to be selected by them not later than thirty (30)days prior to the commencement of construction. The Parties shall employ theIndependent Engineer, whose compensation shall be a part of the Cost of the Work, toverify that Mechanical Completion has occurred and to resolve any disputes among theParties as to the items that should appear on the Punch List.“Law” shall mean (i) any law, legislation, statute, act, rule, ordinance, decree, treaty,regulation, order, judgment, or other similar legal requirement, or (ii) any legally bindingannouncement, directive or published practice or interpretation thereof, enacted, issued orpromulgated by any Governmental Authority.“Lay Down Areas” shall have the meaning assigned to it in Section 4.10.“Major Equipment Suppliers” shall have the meaning assigned to it in Section 4.2.3.“Mechanical Completion” shall have the meaning set forth in Section 10.2.
3-120 | EPC Template“Mechanical Completion Date Guarantee” shall have the meaning set forth in Section11.4.“Minimum Required Capacity” shall have the meaning assigned to it in Section 11.3.1.“O & M Agreement” shall mean that certain Operation and Maintenance Agreement ofdated [date of separate O&M agreement, if Contractor is to perform as operator]between contractor and Owner.“Operator” shall mean Contractor and its successor(s) as operator of the Facility underthe separate O & M Agreement.“Owner” shall mean [Legal name of project developer/owner] .“Owner’s Event of Default” shall have the meaning assigned to it in Section 13.3.“Parent Guarantee” shall have the meaning assigned to it in Section 4.21.“Parties” shall mean Contractor and Owner when referred to collectively and “Party”shall mean any one of the Parties referred to singly.“Payment Due Date” shall have the meaning assigned to it in Section 9.1.2.“Payment Milestones” shall mean those milestones set in Schedule IV.“Payment Milestone Schedule” shall mean Schedule IV.“Payment Period” shall have the meaning assigned to it in Section 9.1.1.1.“Person” shall mean any individual, firm, company, association, general partnership,limited partnership, limited liability company, trust, business trust, corporation, publicbody, or other legal entity.“PM/CM” shall have the meaning assigned to it in Section 4.2.2.“PM/CM’s Contract” shall have the meaning assigned to it in Section 4.2.2.“Prime Subcontractor” shall have the meaning assigned to it in Section 4.2.4.“Prime Subcontractor Contracts” shall have the meaning assigned to it in Section4.2.4.“Progress Report” shall have the meaning assigned to it in Section 9.1.1.1.“Project” shall mean the development of the Facility at the Site by the Contractor, andshall include the Work.
- Page 1 and 2:
สัญญาออกแบบ
- Page 3 and 4:
สัญญาออกแบบ
- Page 5:
สัญญาออกแบบ
- Page 9 and 10:
สัญญาออกแบบ
- Page 11 and 12:
สัญญาออกแบบ
- Page 13:
สัญญาออกแบบ
- Page 17 and 18:
1 | บทน ำ1. บทน ำ
- Page 19 and 20:
3 | บทน ำ• เข้า
- Page 21 and 22:
5 | บทน ำ2) ข้อดี
- Page 23 and 24:
2. สัญญา (Contract)7 |
- Page 25 and 26:
9 | สัญญาสัญญำ
- Page 27 and 28:
11 | สัญญา2.5 สัญ
- Page 29 and 30:
13 | สัญญารูปที
- Page 31 and 32:
15 | สัญญาสัมปท
- Page 33 and 34:
17 | สัญญา(2) กำร
- Page 35 and 36:
19 | การบริหารส
- Page 37 and 38:
3.6 การจัดท าเอ
- Page 39 and 40:
สรุปสั้น ๆ คื
- Page 41 and 42:
10 เงื่อนไขหล
- Page 43 and 44:
27 | การบริหารส
- Page 45 and 46:
29 | การจัดการส
- Page 47 and 48:
31 | การจัดการส
- Page 49 and 50:
33 | การจัดการส
- Page 51 and 52:
35 | การจัดการส
- Page 53 and 54:
37 | การจัดการส
- Page 55 and 56:
39 | การจัดการส
- Page 57 and 58:
41 | การจัดการส
- Page 59 and 60:
43 | การจัดการ EP
- Page 61 and 62:
45 | การจัดการ EP
- Page 63 and 64:
47 | การจัดการ EP
- Page 65 and 66:
49 | การจัดการ EP
- Page 67 and 68:
51 | การจัดการ EP
- Page 69 and 70:
53 | การจัดการ EP
- Page 71 and 72:
55 | การจัดการ EP
- Page 73 and 74:
57 | การจัดการ EP
- Page 75 and 76:
59 | การจัดการค
- Page 77 and 78:
61 | การจัดการค
- Page 79 and 80:
63 | การจัดการค
- Page 81 and 82:
65 | การจัดการข
- Page 83 and 84:
67 | การจัดการข
- Page 85 and 86:
สัญญาออกแบบ
- Page 87:
สัญญาออกแบบ
- Page 91 and 92:
2-1 | การประกวด
- Page 93 and 94:
2-3 | การประกวด
- Page 95 and 96:
2-5 | การประกวด
- Page 97 and 98:
2-7 | การประกวด
- Page 99 and 100:
2-9 | การประกวด
- Page 101 and 102:
2-11 | การประกวด
- Page 103 and 104:
2-13 | การประกวด
- Page 105 and 106:
2-15 | การประกวด
- Page 107 and 108:
2-17 | การประกวด
- Page 109 and 110:
2-19 | การประกวด
- Page 111 and 112:
2-21 | การประกวด
- Page 113 and 114:
2-23 | การประกวด
- Page 115 and 116:
2-25 | การประกวด
- Page 117 and 118:
2-27 | การประกวด
- Page 119 and 120:
2-29 | การประกวด
- Page 121 and 122:
2-31 | การประกวด
- Page 123 and 124:
2-33 | การประกวด
- Page 125 and 126:
2-35 | คู่มือการ
- Page 127 and 128:
2-37 | คู่มือการ
- Page 129 and 130:
2-39 | คู่มือการ
- Page 131 and 132:
2-41 | คู่มือการ
- Page 133 and 134:
2-43 | คู่มือการ
- Page 135 and 136:
2-45 | คู่มือการ
- Page 137 and 138:
2-47 | คู่มือการ
- Page 139 and 140:
2-49 | คู่มือการ
- Page 141 and 142:
8. ไม่จ าเป็นต
- Page 143 and 144:
2-53 | คู่มือการ
- Page 145 and 146:
2-55 | คู่มือการ
- Page 147:
2-57 | คู่มือการ
- Page 151 and 152:
สัญญาออกแบบ
- Page 153:
สัญญาออกแบบ
- Page 157 and 158:
3-2แนวทางการจ
- Page 159 and 160:
3-4สารบัญบทนํ
- Page 161 and 162:
3-61. ความหมายข
- Page 163 and 164:
3-8(2) ขาดวัตถุป
- Page 165 and 166:
3-105. การกําหนด
- Page 167 and 168:
3-12(4) มติคณะรัฐ
- Page 169 and 170:
3-14(7) ขอกําหนดเ
- Page 171 and 172:
3-16งานหรือโคร
- Page 173 and 174:
ตัวอยางแนวว
- Page 175 and 176:
3-20วินิจฉัยได
- Page 177 and 178:
3-22เรื่องที่ 3
- Page 179 and 180:
3-24ยื่นซองประ
- Page 181 and 182:
3-26ขอพิจารณาข
- Page 183 and 184:
3-28ขอพิจารณาข
- Page 185 and 186:
3-30๑. ประเด็นเ
- Page 187 and 188:
3-32ดังนั้น จะเ
- Page 189 and 190:
3-34และไมทําให
- Page 191 and 192:
3-36เรื่องที่ 12
- Page 193 and 194:
3-38แหงชาติ และ
- Page 195 and 196:
3-40ขอพิจารณาข
- Page 197 and 198:
3-42(2) งานจางเหม
- Page 199 and 200:
3-44ประมูลฯ โดย
- Page 201 and 202:
3-46คณะกรรมการ
- Page 203:
ภาคผนวก 3-2 ประ
- Page 206 and 207:
หน้า ๙เล่ม ๑๓
- Page 208 and 209:
3-51ขอ ๓ หลักปร
- Page 210 and 211:
3-53(๑๓) การจายเ
- Page 212 and 213:
3-55หรือผูรับจ
- Page 214 and 215:
3-57ขอ ๑๔ แบบรู
- Page 216 and 217:
3-59ถาผูรับจาง
- Page 218 and 219:
3-61วิธีปฏิบัต
- Page 220 and 221:
แบบสัญญาสัญ
- Page 222 and 223:
่3-65๔.๓ ในกรณี
- Page 224 and 225:
3-67ไปแลวจะตอง
- Page 226 and 227:
3-69ขอ ๑๑ หลักป
- Page 228 and 229: 3-71วิธีปฏิบัต
- Page 230 and 231: 3-73ความใดในเอ
- Page 232 and 233: 3-75ขอ 6 การระงั
- Page 234 and 235: 3-77(9) 8.3 ที่ปรึก
- Page 236 and 237: 3-79สัญญานี้ทํ
- Page 238 and 239: 3-81(15) ใหกําหนด
- Page 241 and 242: 3-82 | EPC TemplateEPC TemplateThis
- Page 243 and 244: 3-84 | EPC Template2.1.6 Necessary
- Page 245 and 246: 3-86 | EPC TemplateContractor shall
- Page 247 and 248: 3-88 | EPC Template“Contractor ha
- Page 249 and 250: 3-90 | EPC Template4.8 Safety Plan.
- Page 251 and 252: 3-92 | EPC TemplateAcceptance Test
- Page 253 and 254: 3-94 | EPC Templatedisrupting the W
- Page 255 and 256: 3-96 | EPC Templateto address aesth
- Page 257 and 258: 3-98 | EPC Template9.1.1.4 Contract
- Page 259 and 260: 3-100 | EPC Templateor more qualifi
- Page 261 and 262: 3-102 | EPC Templatediscovered befo
- Page 263 and 264: 3-104 | EPC Template11.11 Indemnifi
- Page 265 and 266: 3-106 | EPC TemplateOwner would hav
- Page 267 and 268: 3-108 | EPC TemplateMajeure conditi
- Page 269 and 270: 3-110 | EPC Templatedescribed herei
- Page 271 and 272: 3-112 | EPC TemplateIf to Owner:Own
- Page 273 and 274: 3-114 | EPC TemplateBy: ___________
- Page 275 and 276: 3-116 | EPC TemplateSchedule IDefin
- Page 277: “Final Payment” shall have the
- Page 281 and 282: 3-122 | EPC Template“Subcontracto
- Page 283 and 284: 3-124 | EPC Templatevalue of the pr
- Page 285 and 286: 3-126 | EPC Template3. Acceptance T
- Page 287 and 288: 3-128 | EPC TemplateSchedule VLay D
- Page 289 and 290: 3-130 | EPC TemplateSchedule VIIThe
- Page 291 and 292: 3-132 | EPC TemplateSchedule VIIIAp
- Page 293 and 294: 3-134 | EPC Template
- Page 295 and 296: 3-136 | EPC Templateearlier) at the
- Page 297 and 298: 3-138 | EPC Templatesubject matter
- Page 299: ภาคผนวก 3-4: เง
- Page 302 and 303: 3-141 | เงื่อนไขข
- Page 304 and 305: 3-143 | เงื่อนไขข
- Page 306 and 307: 3-145 | เงื่อนไขข
- Page 308 and 309: 3-147 | เงื่อนไขข
- Page 310 and 311: 3-149 | เงื่อนไขข
- Page 312 and 313: 3-151 | เงื่อนไขข
- Page 314 and 315: 3-153 | เงื่อนไขข
- Page 316 and 317: 3-155 | เงื่อนไขข
- Page 318 and 319: 3-157 | เงื่อนไขข
- Page 320 and 321: 3-159 | เงื่อนไขข
- Page 322 and 323: 3-161 | เงื่อนไขข
- Page 324 and 325: 3-163 | เงื่อนไขข
- Page 326 and 327: 3-165 | เงื่อนไขข
- Page 328 and 329:
3-167 | เงื่อนไขข
- Page 330 and 331:
3-169 | เงื่อนไขข
- Page 332 and 333:
3-171 | เงื่อนไขข
- Page 334 and 335:
3-173 | เงื่อนไขข
- Page 336 and 337:
3-175 | เงื่อนไขข
- Page 338 and 339:
3-177 | เงื่อนไขข
- Page 340 and 341:
3-179 | เงื่อนไขข
- Page 342 and 343:
3-181 | เงื่อนไขข
- Page 344 and 345:
3-183 | เงื่อนไขข
- Page 346 and 347:
3-185 | เงื่อนไขข
- Page 348 and 349:
3-187 | เงื่อนไขข
- Page 350 and 351:
3-189 | เงื่อนไขข
- Page 352 and 353:
3-191 | เงื่อนไขข
- Page 354 and 355:
3-193 | เงื่อนไขข
- Page 356 and 357:
3-195 | เงื่อนไขข
- Page 358 and 359:
3-197 | เงื่อนไขข
- Page 360 and 361:
3-199 | เงื่อนไขข
- Page 362 and 363:
3-201 | เงื่อนไขข
- Page 364 and 365:
3-203 | เงื่อนไขข
- Page 366 and 367:
3-205 | เงื่อนไขข
- Page 368 and 369:
3-207 | เงื่อนไขข
- Page 370 and 371:
3-209 | เงื่อนไขข
- Page 373:
ภาคผนวก 3-5: กา
- Page 376 and 377:
3-212 | การปรับปร
- Page 378 and 379:
3-214 | การปรับปร
- Page 380 and 381:
3-216 | การปรับปร
- Page 382 and 383:
3-218 | การปรับปร
- Page 384 and 385:
3-220 | การปรับปร
- Page 386 and 387:
3-222 | การปรับปร
- Page 388 and 389:
3-224 | การปรับปร
- Page 390 and 391:
3-226 | การปรับปร
- Page 392 and 393:
3-228 | การปรับปร
- Page 394 and 395:
3-230 | การปรับปร
- Page 396 and 397:
3-232 | การปรับปร
- Page 399 and 400:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 401 and 402:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 403 and 404:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 405 and 406:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 407 and 408:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 409 and 410:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 411 and 412:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 413 and 414:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 415 and 416:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 417 and 418:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 419 and 420:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 421 and 422:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 423:
ENGINEERING, PROCUREMENT &CONSTRUCT
- Page 427 and 428:
3-258คู่มือ(คณะ)
- Page 429 and 430:
3-260คู่มือ(คณะ)
- Page 431 and 432:
3-262สารบัญเรื่
- Page 433 and 434:
3-264สำรบัญ12. อน
- Page 435 and 436:
3-266กิตติกรรมป
- Page 437 and 438:
3-268คํานํานายก
- Page 439 and 440:
3-270ค าน าเนื้อ
- Page 441 and 442:
3-2721. บทน ำทางเ
- Page 443 and 444:
3-2741. บทน าตามข
- Page 445 and 446:
3-2761. บทน าเดีย
- Page 447 and 448:
3-2781. บทน าเมื่
- Page 449 and 450:
3-2801. บทน าที่ส
- Page 451 and 452:
3-2821. บทน ากฎหม
- Page 453 and 454:
3-284กำรเจรจำ (Amic
- Page 455 and 456:
3-286ช่วยไกล่เก
- Page 457 and 458:
3-2881. บทน าอย่า
- Page 459 and 460:
3-2902. ค ำอธิบำย
- Page 461 and 462:
3-2922. ค าอธิบาย
- Page 463 and 464:
3-2943. ข้อพิจารณ
- Page 465 and 466:
3-2963. ข้อพิจำรณ
- Page 467 and 468:
3-2983. ข้อพิจำรณ
- Page 469 and 470:
3-3003. ข้อพิจำรณ
- Page 471 and 472:
3-3023. ข้อพิจำรณ
- Page 473 and 474:
3-3043. ข้อพิจำรณ
- Page 475 and 476:
3-3063. ข้อพิจำรณ
- Page 477 and 478:
3-3083. ข้อพิจำรณ
- Page 479 and 480:
3-3103. ข้อพิจำรณ
- Page 481 and 482:
3-3124. การพิจารณ
- Page 483 and 484:
3-3144. การพิจารณ
- Page 485 and 486:
3-3164. การพิจารณ
- Page 487 and 488:
3-3184. การพิจารณ
- Page 489 and 490:
3-3204. การพิจารณ
- Page 491 and 492:
3-3224. การพิจารณ
- Page 493 and 494:
3-3244. การพิจารณ
- Page 495 and 496:
3-3264. การพิจารณ
- Page 497 and 498:
3-3285. การเลือกส
- Page 499 and 500:
3-3305. การเลือกส
- Page 501 and 502:
3-3325. การเลือกส
- Page 503 and 504:
3-3345. การเลือกส
- Page 505 and 506:
3-3365. การเลือกส
- Page 507 and 508:
3-3385. การเลือกส
- Page 509 and 510:
3-3406. ค่าตอบแทน
- Page 511 and 512:
3-3426. ค่าตอบแทน
- Page 513 and 514:
3-3447. การตรวจเย
- Page 515 and 516:
3-3467. การตรวจเย
- Page 517 and 518:
3-3487. การตรวจเย
- Page 519 and 520:
3-3507. การตรวจเย
- Page 521 and 522:
3-3527. การตรวจเย
- Page 523 and 524:
3-3547. การตรวจเย
- Page 525 and 526:
3-3567. การตรวจเย
- Page 527 and 528:
3-3588. ข้อมูลที่
- Page 529 and 530:
3-3608. ข้อมูลที่
- Page 531 and 532:
3-3628. ข้อมูลที่
- Page 533 and 534:
3-3649. ความเห็นไ
- Page 535 and 536:
3-3669. ความเห็นไ
- Page 537 and 538:
3-3689. ความเห็นไ
- Page 539 and 540:
3-37010. ข้อแนะน ำ
- Page 541 and 542:
3-37210. ข้อแนะน ำ
- Page 543 and 544:
3-37410. ข้อแนะน ำ
- Page 545 and 546:
3-37611. ระยะเวลา
- Page 547 and 548:
3-37811. ระยะเวลา
- Page 549 and 550:
3-38012. อนุญาโตต
- Page 551 and 552:
3-38212. อนุญาโตต
- Page 553 and 554:
3-38412. อนุญาโตต
- Page 555 and 556:
3-38612. อนุญาโตต
- Page 557 and 558:
3-38812. อนุญาโตต
- Page 559 and 560:
3-39012. อนุญาโตต
- Page 561 and 562:
3-39212. อนุญาโตต
- Page 563 and 564:
3-39412. อนุญาโตต
- Page 565 and 566:
3-396บรรณานุกรม
- Page 567 and 568:
3-398ภาคผนวกภาค
- Page 569 and 570:
3-400ภาคผนวกA1-3
- Page 571 and 572:
3-402ภาคผนวกA1-5
- Page 573 and 574:
3-404ภาคผนวกA1-7
- Page 575 and 576:
3-406ภาคผนวกA1-9
- Page 577 and 578:
3-408ภาคผนวกA1-11
- Page 579 and 580:
3-410ภาคผนวกภาค
- Page 581 and 582:
3-412ภาคผนวกA1-14
- Page 583 and 584:
3-414ภาคผนวกA1-16
- Page 585 and 586:
3-416ภาคผนวกภาค
- Page 587 and 588:
3-418ภาคผนวกA1-20
- Page 589 and 590:
3-420ภาคผนวกA1-22
- Page 591 and 592:
3-422ภาคผนวกA1-24
- Page 593 and 594:
3-424ภาคผนวกภาค
- Page 595 and 596:
3-426ภาคผนวกA1-27
- Page 597 and 598:
3-428ภาคผนวกA1-29
- Page 599 and 600:
3-430ภาคผนวก 2เง
- Page 601 and 602:
3-432ภาคผนวก 2(ค)
- Page 603 and 604:
3-434ภาคผนวก 2ถ้
- Page 605 and 606:
3-436ภาคผนวก 220.3
- Page 607 and 608:
3-438ภาคผนวก 2ภา
- Page 609 and 610:
3-440ภาคผนวก 2(ข)
- Page 611 and 612:
3-442ภาคผนวก 2(ข)
- Page 613 and 614:
3-444ภาคผนวก 3ศั
- Page 615 and 616:
3-446ภาคผนวก 39. แ
- Page 617 and 618:
3-448ภาคผนวก 319. ผ
- Page 619 and 620:
3-450