4. การพิจารณาจัดเตรียมเอกสารประกวดราคา

expenses) the actual cost may vary quite a bit depending upon what

fees can be agreed with the DAAB and where any foreign DAAB

member is

based. The estimate should not overlook local transportation in a

foreign DAAB member’s country, for transport to and from the airport

of departure. Allowance should be made for postage, long distance

telephone, document reproduction, air courier service for

documents, local transportation within the country of the project,

use of Site accommodation and mess hall by the DAAB during the

regular Site visits. Some of these costs likely will arise not only for

the DAAB itself, but for the Employer and the Engineer and their

staffs. Allowance should be included for possible formal disputes

which may require visits by the DAAB which are separate from the

planned regular visits of the DAAB, and may lead to some off-Site

meetings of the DAAB to prepare Decisions on formal disputes.

Also, it is important to include allowance for adequate durations for

regular Site visits, which are likely to be at least 2 to 3 days, plus

travel time from home base to Site and return.

As mentioned elsewhere in this Manual, if the Employer’s contractual

arrangements for the assistance of the Engineer do not include for

4-14