3-130 | EPC Template

Schedule VII

The Work

This schedule necessarily varies from project to project. It must be specific to the

particular equipment selected for the RET project, the characteristics of the renewable

energy technology being utilised, the capabilities and limitations of the project’s design

and equipment, the scope of the work to be done as part of this contract, the nature of the

intended use, and relevant regulatory authorizations or constraints.

The illustrative description of work shown below relates to the design and construction of

a cogeneration facility are offered to provide an example of the scope and detail of a

workable scope of work description.

=====

The Work shall include all design, engineering, procurement, permitting (to the extent

provided in the EPC Contract), construction, erection, installation, training, start-up and

testing activities and services necessary to achieve a complete and operable Facility with

the following equipment and systems:

Two (2) GE Packaged Power, Inc. LM6000 Gas Turbine Generator Sets with:

o GE generator

o Dual fuel system

o Water injection system for NOx control

o Inlet air anti-ice system (heater coil)

o Inlet chiller coil

_ One (1) General Electric Company Steam Turbine Generator Set with:

o GE Design Generator

o Mark VI Turbine Control System

o Lube and Control Oil System

o Gland Sealing System

Two (2) Deltak HRSGs, including HRSG modules, inlet and firing duct work, complete

ammonia unloading, storage and injection system, SCR and CO catalyst, exhaust stacks

with silencers, steam drums, pressure parts, walkways, ladders and stairs and boiler

trim.

Steam turbine condensing system consisting of a condenser, circulating water system,

and cooling towers

Two (2) York 1700 ton YK Inlet Air chiller unit (CTG IAC) and CTG IAC Chiller

Tower

Chilled water system consisting of

o Four (4) York 5000 ton Titan OM chiller units (Campus chillers)

o Marley Cooling Technologies, Inc. Cooling Towers (Campus Chilled Water Tower)

o Primary and secondary chilled water pipes and pumping