3-126 | EPC Template

3. Acceptance Tests for Electric Generation Equipment

Acceptance tests for Electric Generation Equipment shall be as provided in

Schedule 3.2 of the Facility Lease..12

Contractor will develop, using a qualified outside testing firm, appropriate additions

to the above-referenced testing protocols to allow for testing during conditions that may

exist at different times of the year, including less than ideal test conditions. MGE Power

and the State shall take all necessary actions, including without limitation, taking

delivery of all steam and chilled water output, and the State shall coordinate with the

University to ensure that necessary actions are taken, so that the Acceptance Tests can be

completed on the dates so scheduled.