ENGINEERING, PROCUREMENT &

CONSTRUCTION (EPC)

EPC CONSTRUCTION

MANAGEMENT GUIDE

Manual

Document

Page

Issue Date

3-249

EPC

TFC-EPC-CM-D-13, REV A

17 of 25

DRAFT January 31, 2017

The records custodian identified in the Company Level Records Inventory and Disposition

Schedule (RIDS) is responsible for record retention in accordance with TFC-BSM-IRM_DC-C-

02.

7.0 SOURCES

7.1 Requirements

7.2 References

1. Tank Operations Contract, Contract Number DE-AC27-08RV14800

2. TFC-EPC-PLN-01, Complex Engineering, Procurement and Construction Project

Execution

3. RPP-MP-003, “Integrated Environment, Safety, and Health Management System

Description for the Tank Operations Contractor.”

4. TFC-PLN-02, “Quality Assurance Program Description.”

5. TFC-PLN-84, “Tank Operations Contractor Project Execution Plan.”

6. TFC-PLN-113, “Construction Management.”

7. TFC-PRJ-PM-C-02, “Project Management.”

8. TFC-EPC-PLN-03 “EPC Construction Management Plan”

1. TFC-BSM-CP_CPR-C-05, “Procurement of Services.”

2. TFC-BSM-IRM_DC-C-02, “Records Management.”

3. TFC-BSM-IRM_DC-C-07, “Vendor Processes.”

4. TFC-PRJ-CM-C-03, “Construction Daily Activity & Manpower Reports.”

5. TFC-PRJ-CM-C-05, “Construction Meetings.”

6. TFC-PRJ-CM-C-08, “Construction Completion and Turnover.”

7. TFC-PRJ-CM-C-12, “Construction Supplier Backcharges.”

8. TFC-PRJ-CM-C-15, “Construction Subcontract Closeout.”

9. TFC-PRJ-CM-C-16, “Construction Acceptance Testing.”

10. TFC-PRJ-CM-C-17, “Constructability Review Process.”

11. TFC-PRJ-CM-C-18, “Development of Technical Requirements for Construction

Statements of Work.”