Total-EPC-Book=180920
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ENGINEERING, PROCUREMENT &
CONSTRUCTION (EPC)
EPC CONSTRUCTION
MANAGEMENT GUIDE
Manual
Document
Page
Issue Date
3-249
EPC
TFC-EPC-CM-D-13, REV A
17 of 25
DRAFT January 31, 2017
The records custodian identified in the Company Level Records Inventory and Disposition
Schedule (RIDS) is responsible for record retention in accordance with TFC-BSM-IRM_DC-C-
02.
7.0 SOURCES
7.1 Requirements
7.2 References
1. Tank Operations Contract, Contract Number DE-AC27-08RV14800
2. TFC-EPC-PLN-01, Complex Engineering, Procurement and Construction Project
Execution
3. RPP-MP-003, “Integrated Environment, Safety, and Health Management System
Description for the Tank Operations Contractor.”
4. TFC-PLN-02, “Quality Assurance Program Description.”
5. TFC-PLN-84, “Tank Operations Contractor Project Execution Plan.”
6. TFC-PLN-113, “Construction Management.”
7. TFC-PRJ-PM-C-02, “Project Management.”
8. TFC-EPC-PLN-03 “EPC Construction Management Plan”
1. TFC-BSM-CP_CPR-C-05, “Procurement of Services.”
2. TFC-BSM-IRM_DC-C-02, “Records Management.”
3. TFC-BSM-IRM_DC-C-07, “Vendor Processes.”
4. TFC-PRJ-CM-C-03, “Construction Daily Activity & Manpower Reports.”
5. TFC-PRJ-CM-C-05, “Construction Meetings.”
6. TFC-PRJ-CM-C-08, “Construction Completion and Turnover.”
7. TFC-PRJ-CM-C-12, “Construction Supplier Backcharges.”
8. TFC-PRJ-CM-C-15, “Construction Subcontract Closeout.”
9. TFC-PRJ-CM-C-16, “Construction Acceptance Testing.”
10. TFC-PRJ-CM-C-17, “Constructability Review Process.”
11. TFC-PRJ-CM-C-18, “Development of Technical Requirements for Construction
Statements of Work.”