3-305

3. ข้อพิจำรณำในขั้นตอนก่อนด ำเนินกำรโครงกำร

time of the TOC, so that the only reason the DAAB would be required

to do further work after the TOC is any possible dispute which arises

during the Defects Notification Period.

• Suppose there will be 2 Referrals of formal Disputes

to the DAAB during construction.

Cost estimate for the regular Site visits is shown below:

Cost Category

1-person DAAB

Monthly Retainer Fee US$2,000 x 24 months US$48,000

Monthly Retainer

during DNP

Daily fee for Site Visits (3

days for Site visit, half day

x 2 for travel)

Site Visit Expenses

(Inland Transportation,

accommodation, etc.)

Sub-Total (1)

US$1,300 x 12 months

US$2,000 x 4 days x 6 times

US$1,000 x 6times

US$15,600

US$48,000

US$6,000

US$117,600

3-12