Standard for Fire Safety in Rapid Transit Systems - Singapore Civil ...
Standard for Fire Safety in Rapid Transit Systems - Singapore Civil ...
Standard for Fire Safety in Rapid Transit Systems - Singapore Civil ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SECTION 2.10<br />
ABOVEGROUND TRAINWAYS<br />
2.10.1 CONSTRUCTION MATERIALS<br />
2.10.1.1 Aboveground tra<strong>in</strong>ways shall be constructed of noncombustible<br />
materials.<br />
2.10.1.2 The elements of structure <strong>for</strong> aboveground tra<strong>in</strong>ways shall<br />
have a fire resistance of not less than 2 hours.<br />
2.10.1.3 Test of fire resistance shall be <strong>in</strong> accordance with Cl.2.3.4.<br />
2.10.1.4 Coverboard or any protective material used to provide safety<br />
isolation from the contact traction power rail shall have a<br />
flame spread rat<strong>in</strong>g of not less than Class 1 as specified <strong>in</strong><br />
Cl.2.3.13.3 when tested <strong>in</strong> accordance with BS 476: Part 7.<br />
2.10.2 SETBACK DISTANCE<br />
2.10.2.1 Setback distance between tra<strong>in</strong>way structure and adjacent<br />
build<strong>in</strong>g<br />
(a) The setback distance between the proposed tra<strong>in</strong>way<br />
structure and the adjacent build<strong>in</strong>g shall comply with<br />
the distance stipulated <strong>in</strong> Appendix D based on the<br />
extent of unprotected open<strong>in</strong>gs <strong>in</strong> the external wall of<br />
the adjacent build<strong>in</strong>g, us<strong>in</strong>g the outermost edge of the<br />
proposed tra<strong>in</strong>way structure as the relevant boundary,<br />
or at least 6m clear of the outermost edge of the<br />
proposed tra<strong>in</strong>way structure, whichever is greater<br />
(Diagram 2.10.2.1(a)).<br />
(b) For proposed tra<strong>in</strong>way located outside the development<br />
boundary of a private development, the distance<br />
between the adjacent build<strong>in</strong>g(s) and the outermost<br />
edge of the proposed tra<strong>in</strong>way shall be at least 6m<br />
(Diagram 2.10.2.1(b)).<br />
2.10.2.2 The setback distance shall be measured from the edge of<br />
tra<strong>in</strong>ways to the external wall of the adjacent build<strong>in</strong>gs.<br />
2.10.2.3 The height of the enclos<strong>in</strong>g rectangle used <strong>in</strong> the calculations<br />
shall be measured up to the height of the tra<strong>in</strong>ways.<br />
Construction<br />
materials<br />
Setback<br />
distance<br />
<strong>Standard</strong> <strong>for</strong> <strong>Fire</strong> <strong>Safety</strong> <strong>in</strong> <strong>Rapid</strong> <strong>Transit</strong> <strong>Systems</strong> 149