27.04.2013 Views

SAP Basis

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ADM100 Test Your Knowledge<br />

299<br />

Test Your Knowledge<br />

1. A background job contains one or more steps steps. AnABAP<br />

program or an external external command or program can be<br />

executed in a step step of this type. A job can be triggered at a<br />

particular time time or when a defined event event occurs.<br />

Fill in the blanks to complete the sentence.<br />

2. What status can a job have?<br />

Choose the correct answer(s).<br />

A Running<br />

B Released<br />

C Waiting<br />

D Finished<br />

E Error<br />

F Active<br />

3. Which of the listed options for time-dependent scheduling of a job<br />

can be implemented with the standard resources of the <strong>SAP</strong> system?<br />

Choose the correct answer(s).<br />

A Daily at 1500<br />

B The second-last working day of every month<br />

C Every nine days, but not on Sundays<br />

D Only tomorrow at 2355<br />

E Every year on April 1 at 0800<br />

4. Which of the listed options for event-dependent scheduling of a job<br />

can be implemented with the standard resources of the <strong>SAP</strong> system?<br />

Choose the correct answer(s).<br />

A Whenever the system switches to the Night operation mode<br />

B After the job Job1 has run successfully<br />

C Whenever a particular event has been triggered<br />

D Whenever the periodic job Job2 has run successfully<br />

2003/Q3 © 2003 <strong>SAP</strong> AG. All rights reserved. 353

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!