08.01.2013 Views

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

Steel Designers Manual - TheBestFriend.org

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This material is copyright - all rights reserved. Reproduced under licence from The <strong>Steel</strong> Construction Institute on 12/2/2007<br />

To buy a hardcopy version of this document call 01344 872775 or go to http://shop.steelbiz.<strong>org</strong>/<br />

<strong>Steel</strong> <strong>Designers</strong>' <strong>Manual</strong> - 6th Edition (2003)<br />

steel inwards<br />

Fig. 32.9 Roller conveyor system<br />

transfer trestles<br />

angle and flat<br />

take—off trestle<br />

a drying oven<br />

b blast chamber<br />

c paint chamber<br />

d saw<br />

Quality management 967<br />

e measuring carriage<br />

drill centre<br />

g coping centre<br />

_______ steel<br />

outwards<br />

fabricator aware of this requirement to avoid possible accidental damage or injury<br />

to workshop staff; steel is a very unf<strong>org</strong>iving material.<br />

The fabricator will normally <strong>org</strong>anize transport of steel from the workshop to site.<br />

There are loading restrictions on vehicles in terms of weight, width, height and<br />

length.<br />

32.7 Quality management<br />

The key activities within any quality management system are quality assurance and<br />

quality control. These activities are fully embodied in many industry-wide quality

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!